EUVIMEDEUVIMED entdecken
Crossref

Construction and Demolition Waste Management in Public Infrastructure Projects in Ghana: A Study in the Northern-Western Ghana.

Aasonaa D. N, Darimaani C, Dangnikuu T

IOSR Journal of Environmental Science Toxicology and Food Technology · 2026-09 · 20 (9) · 10-20

DOI: 10.9790/2402-2009021020 ↗

Kurz gefasst

Fachartikel in der Zeitschrift IOSR Journal of Environmental Science Toxicology and Food Technology, 2026-09. Verfasst von Aasonaa D. N und 2 weiteren Autor:innen.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Increased construction and infrastructure development in Ghana has meant increased C&DW, posing challenges to urban sustainability. Although the circular economy is increasingly acknowledged, in C&DW, there is scant practical applicability and regulation in many cities of Ghana. This research addressed the management of C&DW in Wa Municipality, Upper West Region, Ghana. This included the reuse of C&DW, the drivers of C&DW, constraints on the use of C&DW, the knowledge of infrastructure development regulations, and the barriers to the protection and preservation of sustainable development. Fifty construction professionals and tradesmen were selected for the research, and a quantitative design using surveys was employed. This was further supplemented by direct observations. Data were analyzed using descriptive statistics. The research found that 46% of the respondents reuse materials. The materials were tiles, metals, timber, and concrete. Reuse was mainly for temporary construction, infill, and artisanal purposes. Such reuse was informal and undocumented and led to a great deal of waste. This was attributed to poor management, inadequate measurements, and a workforce of mainly low skilled artisans. There was a significant lack of knowledge of regulations and enforcement in the municipality was noted as poor. The research proposed that the adapting of C&DW in Ghana could bring sustainable housing and infrastructure. The primary suggestions regarding policy are; (1) implement focused capacity building initiatives for artisans and site managers, (2) revise the current laws to unambiguously reflect C&DW management, (3) provide specific financial incentives to aid contractors in the reuse of material, and (4) provide adequate infrastructure and guidelines to assist in the localization and sustainable C&DW recycling markets to help practice circular economy in construction

Zitieren

APA

N, A. D., C, D., & T, D. (2026). Construction and Demolition Waste Management in Public Infrastructure Projects in Ghana: A Study in the Northern-Western Ghana. IOSR Journal of Environmental Science Toxicology and Food Technology, 20(9), 10-20. https://doi.org/10.9790/2402-2009021020

Vancouver

N AD, C D, T D. Construction and Demolition Waste Management in Public Infrastructure Projects in Ghana: A Study in the Northern-Western Ghana. IOSR Journal of Environmental Science Toxicology and Food Technology. 2026;20(9):10-20. doi:10.9790/2402-2009021020

BibTeX
@article{N2026,
  author = {N, Aasonaa D. and C, Darimaani and T, Dangnikuu},
  title = {Construction and Demolition Waste Management in Public Infrastructure Projects in Ghana: A Study in the Northern-Western Ghana},
  journal = {IOSR Journal of Environmental Science Toxicology and Food Technology},
  year = {2026},
  volume = {20},
  number = {9},
  pages = {10--20},
  doi = {10.9790/2402-2009021020}
}
Kostenlos starten →