MULTI-RESOURCE ALLOCATION AND LEVELING IN MULTI-PROJECT SCHEDULING PROBLEM WITH HYBRID-CHROMOSOME NON-DOMINATED SORTING GENETIC ALGORITHM II
Dimensi Utama Teknik Sipil · 2023
DOI: 10.9744/duts.10.2.232-251 ↗Kurz gefasst
Fachartikel in der Zeitschrift Dimensi Utama Teknik Sipil, 2023. Verfasst von Nathaniel Alvin und 1 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).
Abstract (Originalsprache)
Multi-resource allocation and leveling in multi-project (MR-AL-MP) scheduling refers to the attempt of producing a project schedule with minimum project duration and maximum resource utilization while complying with all precedence and resource availability constraints in a multi-project environment involving multiple resources. This study proposes a model that integrates both resource allocation and leveling models into a unified framework. This study develops a modified version of the Non-Dominated Sorting Genetic Algorithm II (NSGA-II), called Hybrid-Chromosome NSGA-II, as the optimization algorithm. For validation purposes, the performance of Hybrid-Chromosome NSGA-II is compared with two benchmark metaheuristic algorithms which are Multi-Objective Particle Swarm Optimization (MOPSO) and Multi-Objective Symbiotic Organisms Search (MOSOS) in optimizing a case study. It is shown that the proposed model and algorithm are able to produce a set of non-dominated solutions that represent the feasible trade-off relationships between the objectives. Furthermore, the Hybrid-Chromosome NSGA-II is superior to MOPSO and MOSOS in terms of the quality, spread, and diversity of the solutions.
Zitieren
APA
Alvin, N., & Yang, I. (2023). MULTI-RESOURCE ALLOCATION AND LEVELING IN MULTI-PROJECT SCHEDULING PROBLEM WITH HYBRID-CHROMOSOME NON-DOMINATED SORTING GENETIC ALGORITHM II. Dimensi Utama Teknik Sipil. https://doi.org/10.9744/duts.10.2.232-251
Vancouver
Alvin N, Yang I. MULTI-RESOURCE ALLOCATION AND LEVELING IN MULTI-PROJECT SCHEDULING PROBLEM WITH HYBRID-CHROMOSOME NON-DOMINATED SORTING GENETIC ALGORITHM II. Dimensi Utama Teknik Sipil. 2023. doi:10.9744/duts.10.2.232-251
BibTeX
@article{Alvin2023,
author = {Alvin, Nathaniel and Yang, I-Tung},
title = {MULTI-RESOURCE ALLOCATION AND LEVELING IN MULTI-PROJECT SCHEDULING PROBLEM WITH HYBRID-CHROMOSOME NON-DOMINATED SORTING GENETIC ALGORITHM II},
journal = {Dimensi Utama Teknik Sipil},
year = {2023},
doi = {10.9744/duts.10.2.232-251}
}
EUVIMED