EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Waste-to-Energy Policy Governance in Makassar City: An Analysis of Institutional Readiness

Muhammad Raihan Saleh Oddang, Nur Asyifa T, Muh. Ikramullah Akmal, Ibrahim Arda

Interdisciplinary Policy and Management · 01.11.2026 · 28-40

DOI: 10.83835/w6gjbg09 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Interdisciplinary Policy and Management, online erschienen am 01.11.2026. Verfasst von Muhammad Raihan Saleh Oddang und 3 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The Indonesian government has promoted waste-to-energy as an answer to overloaded landfills, but a plant can only work if local institutions turn national mandates into coordinated and durable action. This article examines how ready Makassar City is to govern a waste-to-energy plant. Building on the collaborative governance framework and on the implementation barriers reported in the waste-to-energy literature, we analysed eleven official and media documents published between 2018 and 2026 and rated institutional readiness on seven dimensions: legal basis, intergovernmental coordination, financing and electricity purchase, site and land, upstream waste management, public legitimacy, and organizational capacity. Formal arrangements are the most mature part of the system. A cooperation agreement now binds the South Sulawesi provincial government, Makassar City, Gowa Regency, and Maros Regency, and the environment ministry coordinates the project directly. Readiness across the other dimensions is uneven. The planned plant of 1,000 tonnes per day would absorb about 61 percent of the 1,644 tonnes generated daily in the metropolitan area, leaving roughly 39 percent to source separation and landfill improvement, the two areas where progress is weakest. The financing scheme and the legal mechanism have changed several times, the site is still debated, and civil society objections to waste combustion remain unresolved. The documents offered no direct evidence on organizational capacity. We conclude that Makassar is held back less by missing rules than by weak upstream management, an unstable project design, and unsettled legitimacy. The article contributes a documented readiness profile that other cities in the national waste-to-energy program can adapt and test.

Zitieren

APA

Oddang, M. R. S., T, N. A., Akmal, M. I., & Arda, I. (2026). Waste-to-Energy Policy Governance in Makassar City: An Analysis of Institutional Readiness. Interdisciplinary Policy and Management, 28-40. https://doi.org/10.83835/w6gjbg09

Vancouver

Oddang MRS, T NA, Akmal MI, Arda I. Waste-to-Energy Policy Governance in Makassar City: An Analysis of Institutional Readiness. Interdisciplinary Policy and Management. 2026:28-40. doi:10.83835/w6gjbg09

BibTeX
@article{Oddang2026,
  author = {Oddang, Muhammad Raihan Saleh and T, Nur Asyifa and Akmal, Muh. Ikramullah and Arda, Ibrahim},
  title = {Waste-to-Energy Policy Governance in Makassar City: An Analysis of Institutional Readiness},
  journal = {Interdisciplinary Policy and Management},
  year = {2026},
  pages = {28--40},
  doi = {10.83835/w6gjbg09}
}
Kostenlos starten →