Critical analysis of risk assessment methods applied to construction works
Revista de la Construcción · 30.04.2017 · 16 (1) · 104-114
DOI: 10.7764/rdlc.16.1.10 ↗Kurz gefasst
Fachartikel in der Zeitschrift Revista de la Construcción, online erschienen am 30.04.2017. Verfasst von Antonio José Carpio de los Pinos und 1 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-NC-ND 4.0).
Abstract (Originalsprache)
This paper studies the possibility of using the following occupational risk assessment methods for construction works: INSHT, ANACT, THREP, SHERPA, RNUR, EVENT TREE, LEST, FINE, ERGONOMIC ANALYSIS and PSYCHOSOCIAL FACTORS. Of these methods, INSHT, ANACT, RNUR and FINE have been selected with the objective of applying them to real building works, in order to determine the discrepancies in the results obtained compared to the risks analyzed. The results make it possible to ascertain the types of risk which each method most reliably detects, there being methods which are not able to detect extreme or very low risks. It is concluded that if a single risk assessment method is used, the results do not entirely reflect reality, as such it is necessary to establish a new risk assessment methodology for construction works.
Zitieren
APA
Pinos, A. J. C. D. L., & García, M. D. L. N. G. (2017). Critical analysis of risk assessment methods applied to construction works. Revista de la Construcción, 16(1), 104-114. https://doi.org/10.7764/rdlc.16.1.10
Vancouver
Pinos AJCDL, García MDLNG. Critical analysis of risk assessment methods applied to construction works. Revista de la Construcción. 2017;16(1):104-114. doi:10.7764/rdlc.16.1.10
BibTeX
@article{Pinos2017,
author = {Pinos, Antonio José Carpio de los and García, María de las Nieves González},
title = {Critical analysis of risk assessment methods applied to construction works},
journal = {Revista de la Construcción},
year = {2017},
volume = {16},
number = {1},
pages = {104--114},
doi = {10.7764/rdlc.16.1.10}
}
EUVIMED