Introduction of newer strategies for the highest implementation of delayed umbilical cord clamping after caesarean birth – A quality improvement study
Journal of Pediatric and Neonatal Individualized Medicine · 2023-04 · 12 (1) · e120110-e120110
DOI: 10.7363/120110 ↗Kurz gefasst
Fachartikel in der Zeitschrift Journal of Pediatric and Neonatal Individualized Medicine, 2023-04. Verfasst von Santosh Kumar Panda und 3 weiteren Autor:innen.
Abstract (Originalsprache)
Introduction
Delayed cord clamping (DCC) is a cost-effective delivery room intervention for better neonatal outcome. The study objective was to implement the standard practice of DCC in at least 80% of eligible neonates born by caesarean section (CS) within 2 months through multiple Plan-Do-Study-Act (PDSA) cycles.
Methods
All vigorous neonates born through CS were eligible for clamping of cord ≥ 30 seconds (DCC) after birth except neonates with Rh isoimmunisation, congenital malformations, intra-uterine growth restricted fetuses with abnormal Doppler, placenta previa, abruptio placentae, cord avulsion and monochorionic-monoamniotic twins. Baseline practice of DCC in CS was observed and possible barriers elicited by fishbone analysis. Quality improvement (QI) team implemented various strategies (scientific knowledge dissemination, pre-operative planning for DCC, preventive measures for hypothermia in preterms, “cord clamp clock” in operation theatre, etc.) through a series of PDSA cycles. Timing of cord clamping (CC) was noted by a dedicated staff nurse with stopwatch.
Result
Out of 112 caesarean deliveries conducted during the implementation phase, 48 and 36 deliveries were eligible for DCC during the first (PDSA-1) and the second (PDSA-2) cycle, respectively. During PDSA-1, DCC rate increased from baseline of 20% to 77% which further improved to 83.3% in PDSA-2 and 100% in the sustenance phase. The mean (SD) duration of CC during baseline, PDSA-1, PDSA-2 and sustenance phase were 13.7 (± 9.3), 30 (± 9.4), 35.2 (± 14.2), 46.6 (± 13.9) seconds, respectively.
Conclusion
Implementation of best practice of DCC is challenging and needs multidisciplinary approach. Maintaining high compliance rate of DCC demands boosting confidence among perinatal team members and continued evaluation at regular intervals.
Schlagwörter
Zitieren
APA
Panda, S. K., Gudu, R. K., Dhanawat, A., & Behura, S. S. (2023). Introduction of newer strategies for the highest implementation of delayed umbilical cord clamping after caesarean birth – A quality improvement study. Journal of Pediatric and Neonatal Individualized Medicine, 12(1), e120110-e120110. https://doi.org/10.7363/120110
Vancouver
Panda SK, Gudu RK, Dhanawat A, Behura SS. Introduction of newer strategies for the highest implementation of delayed umbilical cord clamping after caesarean birth – A quality improvement study. Journal of Pediatric and Neonatal Individualized Medicine. 2023;12(1):e120110-e120110. doi:10.7363/120110
BibTeX
@article{Panda2023,
author = {Panda, Santosh Kumar and Gudu, Rama Krushna and Dhanawat, Avantika and Behura, Sushree Smita},
title = {Introduction of newer strategies for the highest implementation of delayed umbilical cord clamping after caesarean birth – A quality improvement study},
journal = {Journal of Pediatric and Neonatal Individualized Medicine},
year = {2023},
volume = {12},
number = {1},
pages = {e120110--e120110},
doi = {10.7363/120110}
}
EUVIMED