EUVIMEDEUVIMED entdecken
Crossref

Enhancing Facility Reliability with Backup Options and Budget Constraint

A. Alenezi

The South African Journal of Industrial Engineering · 2026 · 37 (1)

DOI: 10.7166/37-1-3266 ↗

Kurz gefasst

Fachartikel in der Zeitschrift The South African Journal of Industrial Engineering, 2026. Verfasst von A. Alenezi.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

This study considers facility failures in supply chain networks in which facilities must be located at candidate sites to serve customers. To enhance reliability, we incorporate backup options and a limited fortification budget. Customers assigned to fortified facilities do not require backup, while those assigned to unfortified ones do. The problem is formulated as a linear integer model and solved using Lagrangian relaxation. The relaxed model yields a variant of the binary knapsack problem, addressed through a novel solution method. The proposed approach achieves an average optimality gap of 0.1% with a computational time of 20 seconds.

Zitieren

APA

Alenezi, A. (2026). Enhancing Facility Reliability with Backup Options and Budget Constraint. The South African Journal of Industrial Engineering, 37(1). https://doi.org/10.7166/37-1-3266

Vancouver

Alenezi A. Enhancing Facility Reliability with Backup Options and Budget Constraint. The South African Journal of Industrial Engineering. 2026;37(1). doi:10.7166/37-1-3266

BibTeX
@article{Alenezi2026,
  author = {Alenezi, A.},
  title = {Enhancing Facility Reliability with Backup Options and Budget Constraint},
  journal = {The South African Journal of Industrial Engineering},
  year = {2026},
  volume = {37},
  number = {1},
  doi = {10.7166/37-1-3266}
}
Kostenlos starten →