Risk Assessment Model for Prefabricated Construction Projects Using Multi-Factor Evaluation
Frontiers in Interdisciplinary Applied Science · 2025
DOI: 10.71465/fias341 ↗Kurz gefasst
Fachartikel in der Zeitschrift Frontiers in Interdisciplinary Applied Science, 2025. Verfasst von Daniel R. Bennett und 2 weiteren Autor:innen.
Abstract (Originalsprache)
This study develops a multi-factor risk assessment model for prefabricated construction projects, covering production capacity, transportation limits, on-site conditions, and worker skills. A scoring system was tested on 21 projects across three provinces. Results show that transportation delays and inaccurate component scheduling were the most significant risk contributors. The model provides a structured framework for predicting project uncertainty and improving planning reliability during the early design stage.
Zitieren
APA
Bennett, D. R., Alvarez, S. M., & Nakamura, K. (2025). Risk Assessment Model for Prefabricated Construction Projects Using Multi-Factor Evaluation. Frontiers in Interdisciplinary Applied Science. https://doi.org/10.71465/fias341
Vancouver
Bennett DR, Alvarez SM, Nakamura K. Risk Assessment Model for Prefabricated Construction Projects Using Multi-Factor Evaluation. Frontiers in Interdisciplinary Applied Science. 2025. doi:10.71465/fias341
BibTeX
@article{Bennett2025,
author = {Bennett, Daniel R. and Alvarez, Sofia M. and Nakamura, Kenji},
title = {Risk Assessment Model for Prefabricated Construction Projects Using Multi-Factor Evaluation},
journal = {Frontiers in Interdisciplinary Applied Science},
year = {2025},
doi = {10.71465/fias341}
}
EUVIMED