Alternative Reinforcement Strategies for Distribution Substation under Load Growth: The Viengkeo Case Study
Lao Science Journal · 19.04.2026 · 3 (1) · 272-285
DOI: 10.71026/ls.2026.030121 ↗Kurz gefasst
Fachartikel in der Zeitschrift Lao Science Journal, online erschienen am 19.04.2026. Verfasst von Vongtavanh Xayyatham und 5 weiteren Autor:innen.
Abstract (Originalsprache)
The increasing electricity demand in both industrial and residential sectors poses significant challenges for the distribution substations. This required accommodating such load growth and ensuring the quality of the electricity supply for customers. The traditional way involves installing the new transformer to augment the loading capability. Nonetheless, this method might overlook the condition of the transmission system and potentially affect the surrounding component, such as the transmission line. Addressing these challenges, this research proposed the reinforcement assessment to improve the electrical distribution system by considering the increase in load, with a selected case study: Viengkeo substation. First, this study proceeded with collecting historical load data, followed by forecasting future load, enabling the scenario generation, i.e., a peak load scenario in 2024, and a growing peak load scenario in 2030. Then, three main reinforcement strategies are adopted for each of the scenarios, including: (1) the traditional way, by replacing or increasing the capacity of the substation's transformer, (2) adding distributed generation in the substation, and (3) transferring or sharing the load with another neighboring substation (Load Transfer). In this case, the well-known commercial power flow tool (e.g., DigSILENT PowerFactory) is employed for simulating these scenarios. Later, the obtained solution was analyzed through different indicators such as power loss, overload at the transformer, and voltage quality, enabling a performance evaluation for each strategy. To this end, an overview of the entire 115 kV high-voltage substation system in Vientiane is also considered, to see how the load growth at Viengkeo substation impacts the Vientiane grid. This is to provide long-term planning to accommodate future load growth and serve as a reference for decision-making by electrical system development planners.
Zitieren
APA
Xayyatham, V., Silavy, T., Latthasing, P., Inthala, S., Phrakonkham, S., & Vilaisarn, Y. (2026). Alternative Reinforcement Strategies for Distribution Substation under Load Growth: The Viengkeo Case Study. Lao Science Journal, 3(1), 272-285. https://doi.org/10.71026/ls.2026.030121
Vancouver
Xayyatham V, Silavy T, Latthasing P, Inthala S, Phrakonkham S, Vilaisarn Y. Alternative Reinforcement Strategies for Distribution Substation under Load Growth: The Viengkeo Case Study. Lao Science Journal. 2026;3(1):272-285. doi:10.71026/ls.2026.030121
BibTeX
@article{Xayyatham2026,
author = {Xayyatham, Vongtavanh and Silavy, Thipphakhong and Latthasing, Peeza and Inthala, Soumek and Phrakonkham, Sengprasong and Vilaisarn, Youthanalack},
title = {Alternative Reinforcement Strategies for Distribution Substation under Load Growth: The Viengkeo Case Study},
journal = {Lao Science Journal},
year = {2026},
volume = {3},
number = {1},
pages = {272--285},
doi = {10.71026/ls.2026.030121}
}
EUVIMED