Explaining Cost Performance in Belt and Road Transport Projects
Journal of Global Trends in Social Science · 28.05.2026 · 3 (3) · 1-21
DOI: 10.70731/c6wgxz82 ↗Kurz gefasst
Fachartikel in der Zeitschrift Journal of Global Trends in Social Science, online erschienen am 28.05.2026. Verfasst von Yongli Zhang und 4 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).
Abstract (Originalsprache)
The literature on cost performance in major transport infrastructure projects has expanded rapidly, yet much of it still explains overruns through macro conditions, project characteristics, or single-case narratives. Far less is known about how contractor-side capabilities are translated into cost outcomes in cross-border settings, particularly within Belt and Road Initiative (BRI) transport projects where institutional variation, technological demands, and multicultural collaboration are unusually salient. This article addresses that gap by examining contractor experience, contract management capability, technological complexity, and government support as antecedents of project cost performance, with project risk management capability as a mediator and cross-cultural communication effectiveness as a moderator. Drawing on a survey of 391 contractor project management personnel involved in railway and highway projects across Southeast Asia, East Africa, and Central Asia, the study applies partial least squares structural equation modelling. The results show that contractor experience, contract management capability, and government support have significant positive direct effects on cost performance, whereas technological complexity does not. All four antecedents significantly affect project risk management capability, which in turn improves cost performance. Mediation analysis shows a partial indirect effect for contract management capability and a full indirect effect for technological complexity, while the indirect effects of contractor experience and government support are not statistically significant. Cross-cultural communication effectiveness significantly strengthens the positive effect of project risk management capability on cost performance. The article contributes to BRI project management research by developing a contractor-centred explanation of cost performance, clarifying the differentiated roles of internal capabilities and external support, and showing that risk management and communication operate as distinct but complementary mechanisms in multinational project environments.
Zitieren
APA
Zhang, Y., Gan, W., Mohammed, T. A., Xiao, M., & Liu, J. (2026). Explaining Cost Performance in Belt and Road Transport Projects. Journal of Global Trends in Social Science, 3(3), 1-21. https://doi.org/10.70731/c6wgxz82
Vancouver
Zhang Y, Gan W, Mohammed TA, Xiao M, Liu J. Explaining Cost Performance in Belt and Road Transport Projects. Journal of Global Trends in Social Science. 2026;3(3):1-21. doi:10.70731/c6wgxz82
BibTeX
@article{Zhang2026,
author = {Zhang, Yongli and Gan, Weixiang and Mohammed, Tara Ahmed and Xiao, Mengfei and Liu, Jialin},
title = {Explaining Cost Performance in Belt and Road Transport Projects},
journal = {Journal of Global Trends in Social Science},
year = {2026},
volume = {3},
number = {3},
pages = {1--21},
doi = {10.70731/c6wgxz82}
}
EUVIMED