Theory and application of a method for prioritizing bridge interventions

Alberto Contardi

International Journal of Bridge Engineering, Management and Research · 10.07.2026 · 3 (3)

DOI: 10.70465/ber.v3i3.93 ↗

Kurz gefasst

Fachartikel in der Zeitschrift International Journal of Bridge Engineering, Management and Research, online erschienen am 10.07.2026. Verfasst von Alberto Contardi. Der Volltext ist frei zugänglich (Open Access, CC BY-NC-ND 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

This article presents a calculation method developed by the company Sina with the aim of establishing a priority ranking for interventions involving the improvement, upgrading, or demolition and reconstruction of a set of bridges. As a measure of the urgency of an intervention, the “cost of postponement” for the community is proposed, defined as the increased risk associated with maintaining the current state of the structure for one year. Following the standard logic of risk analysis, this cost is estimated by multiplying the probability of bridge collapse, calculated over a one-year period, by all the potential damages that such a collapse would cause. Although the calculation is affected by several sources of uncertainty, the proposed procedure, based on the collection of a few essential data points and a limited number of simple steps, allows for sufficiently reliable comparisons between bridges. It highlights which characteristics most significantly influence risk and which can reasonably be neglected.

Zitieren

APA

Contardi, A. (2026). Theory and application of a method for prioritizing bridge interventions. International Journal of Bridge Engineering, Management and Research, 3(3). https://doi.org/10.70465/ber.v3i3.93

Vancouver

Contardi A. Theory and application of a method for prioritizing bridge interventions. International Journal of Bridge Engineering, Management and Research. 2026;3(3). doi:10.70465/ber.v3i3.93

BibTeX
@article{Contardi2026,
  author = {Contardi, Alberto},
  title = {Theory and application of a method for prioritizing bridge interventions},
  journal = {International Journal of Bridge Engineering, Management and Research},
  year = {2026},
  volume = {3},
  number = {3},
  doi = {10.70465/ber.v3i3.93}
}
Kostenlos starten →