REDUCCIÓN DE TIEMPOS DE PREPARACIÓN DE MÁQUINAS APLICANDO SMED EN UNA EMPRESA MANUFACTURERA
FEGLININ · 2017
DOI: 10.70417/f-atts__dh ↗Kurz gefasst
Fachartikel in der Zeitschrift FEGLININ, 2017. Verfasst von Martín Flores Zuñiga und 3 weiteren Autor:innen.
Abstract (Originalsprache)
Equipment availability and the reduction of preparation times are fundamental in the manufacturing sector. This article presents the application of SMED in a manufacturing company, to reduce the preparation times of drilling machines. The process included measuring preliminary times, classifying internal and external activities, converting internal activities into external ones, and improving key activities. Personnel were also trained, and verification tools were implemented to maintain the changes. The results reflected a notable reduction in preparation time, supported by statistical validation. This case highlights the effectiveness of SMED in process optimization and the relevance of collaboration between operational personnel and management in continuous improvement initiatives.
Zitieren
APA
Zuñiga, M. F., Flores, F. O., Sentíes, O. B., & Mortera, J. L. H. (2017). REDUCCIÓN DE TIEMPOS DE PREPARACIÓN DE MÁQUINAS APLICANDO SMED EN UNA EMPRESA MANUFACTURERA. FEGLININ. https://doi.org/10.70417/f-atts__dh
Vancouver
Zuñiga MF, Flores FO, Sentíes OB, Mortera JLH. REDUCCIÓN DE TIEMPOS DE PREPARACIÓN DE MÁQUINAS APLICANDO SMED EN UNA EMPRESA MANUFACTURERA. FEGLININ. 2017. doi:10.70417/f-atts__dh
BibTeX
@article{Zuiga2017,
author = {Zuñiga, Martín Flores and Flores, Fernando Ortiz and Sentíes, Oscar Báez and Mortera, Jorge Luís Hernández},
title = {REDUCCIÓN DE TIEMPOS DE PREPARACIÓN DE MÁQUINAS APLICANDO SMED EN UNA EMPRESA MANUFACTURERA},
journal = {FEGLININ},
year = {2017},
doi = {10.70417/f-atts__dh}
}