EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Implication of Design and Construction on Engineering Project in Bauchi State

Zakari, Danladi, Ahmed, Babayo, Adamu Makama Pindiga, Abubakar Abdulkadir

Journal of Applied Ecology and Environmental Design · 2025

DOI: 10.70382/hujaeed.v4i8.005 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Journal of Applied Ecology and Environmental Design, 2025. Verfasst von Zakari und 5 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The importance of providing adequate road networks linking rural areas with the city centre’s for the development of this nation, called for concerted efforts to provide quality data for its construction. Variation of price (VOP) is a contractual clause that allows for adjustment to the contract price based on changes in materials or labour costs during project execution. The objective can only be achieved through proper survey observations to furnish engineers with the necessary survey data for geometric designs which serve as the framework for the construction of civil and building engineering project. Route Survey is usually conducted to capture spatial data for geometric design of roads. It provide data for the heighting, alignment, as well as for the setting out curves, culverts, bridges where necessary along communication routes such as road networks, railroads, canals, transmission lines, and pipelines. The proposed route starts from Yelwan Duguri to Birim village in Alkaleri Local Government Area of Bauchi State, covering a distance of habitants of both villages are mainly farmers and are in daring need of good roads, specifically this particular project if utilized, could facilitate the conveyance of their farm produces to the city centre. Sokkia SET 600 Total Station instruments was used to carry out the route survey along the proposed road to provide data on the existing Position and heights as well as the topographic features within the corridor for the plotting of the longitudinal profile of the road and subsequent Engineering design of the Geometry of the road. Levelling was carried out along the proposed route at 20m interval to provide vertical controls for the alignment of the centre-line of the route and for the design of the longitudinal profile. Hydraulic structure such as culvert and concrete line drain were designed in this research for road construction. Engineering bill of quantity was also produced for appropriate costing of engineering work. This research work is recommended for used by the Bauchi state Government as well as the Federal Government of Nigeria.

Zitieren

APA

Zakari, Danladi, Ahmed, Babayo, Pindiga, A. M., & Abdulkadir, A. (2025). Implication of Design and Construction on Engineering Project in Bauchi State. Journal of Applied Ecology and Environmental Design. https://doi.org/10.70382/hujaeed.v4i8.005

Vancouver

Zakari, Danladi, Ahmed, Babayo, Pindiga AM, Abdulkadir A. Implication of Design and Construction on Engineering Project in Bauchi State. Journal of Applied Ecology and Environmental Design. 2025. doi:10.70382/hujaeed.v4i8.005

BibTeX
@article{Zakari2025,
  author = {Zakari and Danladi and Ahmed and Babayo and Pindiga, Adamu Makama and Abdulkadir, Abubakar},
  title = {Implication of Design and Construction on Engineering Project in Bauchi State},
  journal = {Journal of Applied Ecology and Environmental Design},
  year = {2025},
  doi = {10.70382/hujaeed.v4i8.005}
}
Kostenlos starten →