EUVIMEDEUVIMED entdecken
Crossref

Data-Driven Methods for Asset Priority and Disposal Planning In PublicPower Grids

Nagamuneendra Pulidhindi

Journal of Electronics and Power Engineering · 2025

DOI: 10.69996/jepe.2025009 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Journal of Electronics and Power Engineering, 2025. Verfasst von Nagamuneendra Pulidhindi.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Asset priority and disposal planning in public power grids is crucial for ensuring efficient and reliable energy distribution. This process involves strategic decision-making based on data-driven analysis of asset performance, maintenance histories, and lifecycle costs. By prioritizing critical assets for maintenance or replacement and planning timely disposals, utilities can optimize resource allocation, minimize downtime risks, and extend the lifespan of infrastructure. Effective asset management not only enhances grid reliability but also contributes to cost savings and sustainability efforts within the public power sector. This paper introduces Particle Intelligence Swarm Optimization (PISO) as a novel approach for asset priority and disposal planning in public power grids, leveraging data-driven methodologies. PISO integrates swarm intelligence principles with advanced data analytics to optimize asset management strategies. By analysing historical data on asset performance, maintenance records, and lifecycle costs, PISO identifies critical assets requiring priority maintenance or replacement. This approach ensures efficient allocation of resources and minimizes downtime risks, thereby enhancing grid reliability and operational efficiency. Furthermore, PISO employs predictive analytics to forecast asset lifespans and plan for timely disposals, contributing to cost effective asset management and sustainability in public power infrastructures. Experimental results demonstrate significant improvements in asset reliability and lifecycle management, with PISO reducing maintenance costs by up to 15% and enhancing asset utilization rates by 20%. The adoption of PISO offers a robust framework for optimizing asset management decisions in public power grids, paving the way for smarter infrastructure planning and resource allocation.

Zitieren

APA

Pulidhindi, N. (2025). Data-Driven Methods for Asset Priority and Disposal Planning In PublicPower Grids. Journal of Electronics and Power Engineering. https://doi.org/10.69996/jepe.2025009

Vancouver

Pulidhindi N. Data-Driven Methods for Asset Priority and Disposal Planning In PublicPower Grids. Journal of Electronics and Power Engineering. 2025. doi:10.69996/jepe.2025009

BibTeX
@article{Pulidhindi2025,
  author = {Pulidhindi, Nagamuneendra},
  title = {Data-Driven Methods for Asset Priority and Disposal Planning In PublicPower Grids},
  journal = {Journal of Electronics and Power Engineering},
  year = {2025},
  doi = {10.69996/jepe.2025009}
}
Kostenlos starten →