Design of a Mixed-Zone Completion Using a Single Oil Production Column in a Non-Eruptive Well with Two Oil and Gas Reservoirs
Information Technology in Economics and Business · 30.07.2026 · 3 (2) · 78-84
DOI: 10.69882/adba.iteb.2026076 ↗Kurz gefasst
Fachartikel in der Zeitschrift Information Technology in Economics and Business, online erschienen am 30.07.2026. Verfasst von Martin Kevin Bakalak Bayoi und 5 weiteren Autor:innen. Die Arbeit nennt 30 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY-NC 4.0).
Abstract (Originalsprache)
The objective of this paper was to design a multi-zone completion to produce oil from a well designated PX (for confidentiality reasons). The well contains two reservoirs: one with non-eruptive oil and the other with an eruptive deep-seated gas reservoir. Analysis revealed that the initial hydrocarbon reserves indicate that the R7 oil reservoir contains 4.517396985 × 10^10 STB of initial oil, while the R8 gas reservoir contains 29.04429927 × 10^6 MMscf of initial gas. A multi-zone completion scheme was designed to extract oil from the R7 oil reservoir by utilizing energy from the deep-seated R8 gas reservoir through a single production string. Following implementation of the proposed completion, the R7 oil reservoir achieved a production rate of 2,700 STB/d, with production supported by the deep-seated R8 gas reservoir. Three oil price scenarios per barrel were selected based on market price fluctuations over a 10-year period: low (Scenario 1), medium (Scenario 2), and high (Scenario 3). The economic evaluation showed that Scenario 1 yielded a net present value (NPV) of $328.7843 and an internal rate of return (IRR) of 16.63%, Scenario 2 yielded an NPV of $602.4843 and an IRR of 12.14%, and Scenario 3 yielded an NPV of $687.1949 and an IRR of 9.62%. The results demonstrate that producing oil from the R7 oil reservoir using energy supplied by the deep-seated R8 gas reservoir remains economically profitable under all considered oil price scenarios.
Zitieren
APA
Bayoi, M. K. B., Tsamo, N., Ngongiah, I. K., Ngopuh, F. K., Toko, D. T., & Talla, P. K. (2026). Design of a Mixed-Zone Completion Using a Single Oil Production Column in a Non-Eruptive Well with Two Oil and Gas Reservoirs. Information Technology in Economics and Business, 3(2), 78-84. https://doi.org/10.69882/adba.iteb.2026076
Vancouver
Bayoi MKB, Tsamo N, Ngongiah IK, Ngopuh FK, Toko DT, Talla PK. Design of a Mixed-Zone Completion Using a Single Oil Production Column in a Non-Eruptive Well with Two Oil and Gas Reservoirs. Information Technology in Economics and Business. 2026;3(2):78-84. doi:10.69882/adba.iteb.2026076
BibTeX
@article{Bayoi2026,
author = {Bayoi, Martin Kevin Bakalak and Tsamo, Nestor and Ngongiah, Isidore Komofor and Ngopuh, Finalise Komofor and Toko, Denis Tcheukam and Talla, Pierre Kisito},
title = {Design of a Mixed-Zone Completion Using a Single Oil Production Column in a Non-Eruptive Well with Two Oil and Gas Reservoirs},
journal = {Information Technology in Economics and Business},
year = {2026},
volume = {3},
number = {2},
pages = {78--84},
doi = {10.69882/adba.iteb.2026076}
}
EUVIMED