The Correlation Between Construction Management Efficacy and Hydraulic Design Compliance with Cost Overruns in Public-Private Partnership (PPP) Water Supply Projects

Rini Damayanti, Meny Sriwati, Sudirman, Nur Khaerat Nur, Mardewi Jamal

Structures, Infrastructure, Planning, Implementation, and Legislation · 2025

DOI: 10.69855/sipil.v1i2.322 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Structures, Infrastructure, Planning, Implementation, and Legislation, 2025. Verfasst von Rini Damayanti und 4 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

This study investigates the correlation between construction management efficacy and hydraulic design compliance with cost overruns in Indonesian Public-Private Partnership (PPP) water supply projects. Employing a mixed-methods approach, the research integrates quantitative analysis of official project data (contract values, DEDs, QC reports) with qualitative stakeholder insights. Key findings demonstrate a significant negative correlation between effective managerial oversight and cost overruns (r = -0.632), and similarly, between strict hydraulic adherence and cost overruns (r=-0.527). Unforeseen site conditions and design modifications were confirmed as significant exacerbating factors. The results highlight the imperative for integrated risk management, combining rigorous managerial scrutiny and unwavering technical discipline to mitigate budgetary risk. Policy recommendations emphasize enhancing inter-stakeholder coordination, enforcing technical standards, and leveraging digital monitoring tools to improve PPP project efficiency and sustainability.

Zitieren

APA

Damayanti, R., Sriwati, M., Sudirman, Nur, N. K., & Jamal, M. (2025). The Correlation Between Construction Management Efficacy and Hydraulic Design Compliance with Cost Overruns in Public-Private Partnership (PPP) Water Supply Projects. Structures, Infrastructure, Planning, Implementation, and Legislation. https://doi.org/10.69855/sipil.v1i2.322

Vancouver

Damayanti R, Sriwati M, Sudirman, Nur NK, Jamal M. The Correlation Between Construction Management Efficacy and Hydraulic Design Compliance with Cost Overruns in Public-Private Partnership (PPP) Water Supply Projects. Structures, Infrastructure, Planning, Implementation, and Legislation. 2025. doi:10.69855/sipil.v1i2.322

BibTeX
@article{Damayanti2025,
  author = {Damayanti, Rini and Sriwati, Meny and Sudirman and Nur, Nur Khaerat and Jamal, Mardewi},
  title = {The Correlation Between Construction Management Efficacy and Hydraulic Design Compliance with Cost Overruns in Public-Private Partnership (PPP) Water Supply Projects},
  journal = {Structures, Infrastructure, Planning, Implementation, and Legislation},
  year = {2025},
  doi = {10.69855/sipil.v1i2.322}
}
Kostenlos starten →