EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Gestão e controle de acuracidade de estoque de um estaleiro em Manaus.

Felipe Matheus Figueiredo Tiburcio, Amanda Caroline Mesquita Vieira, Emanuelle Oliveira de Souza, Jessyca Katheleen Oliveira Carvalho, Maria Clara de Oliveira Alves, Maria Eduarda da Silva Chaves, Luciana Oliveira do Valle Carminé

Revista ft · 12.11.2026 · 30 (164) · 01-26

DOI: 10.69849/vk1v0933 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Revista ft, online erschienen am 12.11.2026. Verfasst von Felipe Matheus Figueiredo Tiburcio und 6 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The shipbuilding industry operates on a build-to-order basis, demanding high accuracy in the management and handling of its inventories. This study aimed to map and optimize the flow of material requisitions, production orders, transfers, returns, and material regularization in a large-scale shipyard in Manaus, Amazonas (Brazil). The central problem stems from discrepancies in the specification of material requisitions and production orders, which result in the improper allocation of these materials in the company's manufacturing yard. Exposed to Amazonian rains and weather, these materials suffer severe corrosion and become unusable when returned to the warehouse. Furthermore, the company's 60-day limit for returns induces ad-hoc system reincorporation through the artifice of "other entries," generating ghost inventories and breaking accounting traceability. Qualitative and exploratory research based on a case study was adopted, featuring direct on-site observation, semi-structured interviews with employees from the warehouse and PPCC (Production Planning and Control) departments, and process modeling using quality tools. To identify root causes, the Ishikawa Diagram and the 5 Whys technique were applied, highlighting the absence of technical quarantine, the lack of protocols for leftovers resulting from engineering changes, and the shortage of standardized inspection procedures. As an intervention proposal, the future-state modeling (TO-BE) was developed, structured in a 5W2H action plan and the drafting of a Standard Operating Procedure (SOP), establishing the reduction of the return window to up to 72 hours, the blocking of ad-hoc "other entries" adjustments in the ERP, and the mandatory segregation of returns pending Quality approval. Finally, a performance indicator (KPI) dashboard was formulated aimed at guaranteeing accuracy above 95%, ensuring the financial traceability of construction costs and the preservation of manufacturing assets.

Zitieren

APA

Tiburcio, F. M. F., Vieira, A. C. M., Souza, E. O. D., Carvalho, J. K. O., Alves, M. C. D. O., Chaves, M. E. D. S., & Carminé, L. O. D. V. (2026). Gestão e controle de acuracidade de estoque de um estaleiro em Manaus. Revista ft, 30(164), 01-26. https://doi.org/10.69849/vk1v0933

Vancouver

Tiburcio FMF, Vieira ACM, Souza EOD, Carvalho JKO, Alves MCDO, Chaves MEDS, et al. Gestão e controle de acuracidade de estoque de um estaleiro em Manaus. Revista ft. 2026;30(164):01-26. doi:10.69849/vk1v0933

BibTeX
@article{Tiburcio2026,
  author = {Tiburcio, Felipe Matheus Figueiredo and Vieira, Amanda Caroline Mesquita and Souza, Emanuelle Oliveira de and Carvalho, Jessyca Katheleen Oliveira and Alves, Maria Clara de Oliveira and Chaves, Maria Eduarda da Silva and Carminé, Luciana Oliveira do Valle},
  title = {Gestão e controle de acuracidade de estoque de um estaleiro em Manaus},
  journal = {Revista ft},
  year = {2026},
  volume = {30},
  number = {164},
  pages = {01--26},
  doi = {10.69849/vk1v0933}
}
Kostenlos starten →