Assessment of the Adoption of E-Procurement in Public Institutions in Nigeria
Journal of Economics, Business, and Commerce · 25.04.2026 · 3 (1) · 156-164
DOI: 10.69739/jebc.v3i1.1700 ↗Kurz gefasst
Fachartikel in der Zeitschrift Journal of Economics, Business, and Commerce, online erschienen am 25.04.2026. Verfasst von Victor Chijindu Iheaka und 4 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).
Abstract (Originalsprache)
E-procurement is the electronic way of acquiring goods, services, and works from external sources to meet the organization requirements. This study aimed at establishing the relationship that exists between the adoption of e-procurement and its enablers, as well as assessing the influence of e-procurement adoption enablers and its implementation. Quantitative research design was used in this study, which focuses on testing hypotheses and revealing empirical results that are relevant making predictions and forecasting through systematic data analysis. A structured questionnaire was administered to the selected public institutions to obtain data, and multiple linear regression was used for the data analysis. The results showed that the adoption of e-procurement had a positive relationship with the factors used in this study that will trigger its implementation namely; Legal Regulatory Framework (LRF), Staff Competence (SCT), Infrastructure Technology (INT), as established in the model. While, Organizational Readiness (ORR), another factor used in this study that could trigger implementation, had a negative relationship with adoption enablers. The findings from this study revealed that LRF, SCT and INT have a statistically significant impact on the adoption of e-procurement at 5% level of significance (p-values = 0.0467, 0.000, 0.000 and 0.000, respectively), whereas the ORR were statistically insignificant at 5% level of significance (p-value = 0.2967). An R2 value of 0.9626 shown that that about 96.26% of the total variations in the adoption of e-procurement were accounted for by variations in the independent variables (LFR, SCT, INT and ORR) used in this study. It was concluded based on the findings from the study that strengthening legal frameworks, enhancing staff capacity, and investing in technological infrastructure are important for improving e-procurement adoption.
Zitieren
APA
Iheaka, V. C., Duru, E. E., Eze, O., Nwachukwu, M. U., & Onyenawuli, P. C. (2026). Assessment of the Adoption of E-Procurement in Public Institutions in Nigeria. Journal of Economics, Business, and Commerce, 3(1), 156-164. https://doi.org/10.69739/jebc.v3i1.1700
Vancouver
Iheaka VC, Duru EE, Eze O, Nwachukwu MU, Onyenawuli PC. Assessment of the Adoption of E-Procurement in Public Institutions in Nigeria. Journal of Economics, Business, and Commerce. 2026;3(1):156-164. doi:10.69739/jebc.v3i1.1700
BibTeX
@article{Iheaka2026,
author = {Iheaka, Victor Chijindu and Duru, Erasmus Ejike and Eze, Ogechi and Nwachukwu, Meschach Uchenna and Onyenawuli, Prisca Chinyere},
title = {Assessment of the Adoption of E-Procurement in Public Institutions in Nigeria},
journal = {Journal of Economics, Business, and Commerce},
year = {2026},
volume = {3},
number = {1},
pages = {156--164},
doi = {10.69739/jebc.v3i1.1700}
}
EUVIMED