Quality control management of road infrastructure projects of the Department of Public Works and Highways (DPWH) Albay First District
Pantao (International Journal of the Humanities and Social Sciences) · 2026 · 5 (1)
DOI: 10.69651/pijhss0501880 ↗Kurz gefasst
Fachartikel in der Zeitschrift Pantao (International Journal of the Humanities and Social Sciences), 2026. Verfasst von Charlyn Madrid.
Abstract (Originalsprache)
This study determined the status of the quality control management of road infrastructure projects in the Department of Public Works and Highways Albay First Engineering District for fiscal year 2024 to 2025. It sought answers to the following sub-problems: 1) What is the level of compliance to the specification standards for road infrastructure projects along material requirements, testing requirements and construction requirements?; 2) What is the level of effectiveness of the quality control management along the above areas of concern?; 3) Is there a significant relationship between the level of compliance and effectiveness on the quality control management of road infrastructures along the areas?; 4) What are the problems met by the respondents along the areas of concern? and 5) What quality control plan may be proposed to address the problems met? The indicators that were used to quantify the level of compliance were based from selected specification standards by the Department of Public Works and Highways and carefully lifted to contextualize the study in Albay First Engineering District. This research study utilized the quantitative research design. Specifically, it employed the descriptive survey method. Furthermore, it used a correlational approach and tested the hypothesis that there is no significant relationship between the level of compliance and level of effectiveness of the quality control management. The problems met in quality control management of road infrastructures were also identified. The respondents of this study were twenty-six (26) employees of the Quality Control Management Unit of the Department of Public Works and Highways (DPWH) Albay First District Engineering Office. Total enumeration was employed. The statistical measures used were frequency count, weighted mean, Pearson Product Moment Coefficient of Correlation, t-test of r and ranking. This study explored the level of compliance to the specification standards for road infrastructure projects along three (3) areas of concern. These are material requirements, testing requirements and construction requirements. Among the three (3) areas covered in this study on the level of compliance, the area with the highest average weighted mean of 4.98 is obtained in testing requirements. It is followed by construction requirements with 4.90 and the area with the lowest average weighted means of 4.87 is material requirements. All these areas have the adjectival description of exemplary compliant. The level of compliance to specification standards for road infrastructure projects along the three (3) areas of concern such as material requirements, testing requirements and construction requirements has an over-all average 0f 4.92 with an adjectival description of exemplary compliant. The area with the highest average weighted mean of 4.99 is obtained in testing requirements followed by construction requirements with 4.89 and material requirements with 4.88. All these numerical ratings have an adjectival description of very high. The level of effectiveness of the quality control management of road infrastructure projects along material requirements, testing requirements and construction requirements has an over-all average of 4.92 with an adjectival description of very high. There is a significant relationship between the level of compliance and level of effectiveness of the quality control management of road infrastructure projects of the Department of Public Works and Highways along material requirements, testing requirements and construction requirements. The problems with the highest number of frequencies in the three (3) areas of concerns are: along material requirement, it is the contractor is not present at all times during the construction phase of the project; along testing requirements, it is the contractor does not have enough knowledge and expertise on proper sampling, testing and inspection necessary to assure the quality control of the materials and concrete and along construction requirement, it is the Resident Engineer is not present at all times during the construction phase of the project. A quality control plan was crafted to address the problems met. Each of the problem identified in every area of concern was addressed. The plan follows the template used in government offices such as the Department of Public Works and Highways.
Zitieren
APA
Madrid, C. (2026). Quality control management of road infrastructure projects of the Department of Public Works and Highways (DPWH) Albay First District. Pantao (International Journal of the Humanities and Social Sciences), 5(1). https://doi.org/10.69651/pijhss0501880
Vancouver
Madrid C. Quality control management of road infrastructure projects of the Department of Public Works and Highways (DPWH) Albay First District. Pantao (International Journal of the Humanities and Social Sciences). 2026;5(1). doi:10.69651/pijhss0501880
BibTeX
@article{Madrid2026,
author = {Madrid, Charlyn},
title = {Quality control management of road infrastructure projects of the Department of Public Works and Highways (DPWH) Albay First District},
journal = {Pantao (International Journal of the Humanities and Social Sciences)},
year = {2026},
volume = {5},
number = {1},
doi = {10.69651/pijhss0501880}
}
EUVIMED