Predictive Maintenance Scheduling for Heavy Manufacturing Equipment Based on Sensor Degradation Curves
Journal of Business Intelligence & Decision Science Review · 08.09.2026 · 1
DOI: 10.69013/re3483pr ↗Kurz gefasst
Fachartikel in der Zeitschrift Journal of Business Intelligence & Decision Science Review, online erschienen am 08.09.2026. Verfasst von MD Shamim Ahmed und 1 weiteren Autor:innen. Die Arbeit nennt 24 Literaturangaben.
Abstract (Originalsprache)
Unplanned downtime in heavy manufacturing environments inflicts severe financial losses, compromises worker safety, and disrupts production schedules. Traditional preventive maintenance approaches rely on static, time-based overhaul intervals that fail to account for operational stress variations, leading to either premature component replacement or catastrophic in-service failures. This paper establishes an automated, real-time predictive maintenance scheduling architecture that estimates equipment Remaining Useful Life (RUL) by modeling non-linear sensor degradation curves via stochastic Wiener and Gamma degradation processes. Our framework extracts multi-sensor Industrial Internet of Things (IIoT) telemetry including tri-axial vibration acceleration, thermal dissipation deltas, acoustic emissions, and lubricant particle counts to parameterize dynamic health indices. Evaluated on an empirical dataset of 1,250 heavy industrial assets (CNC milling centers, hydraulic presses, steam turbines, and conveyor drives) tracking 85 million sensor readings across six manufacturing plants between 2020 and 2026, our stochastic RUL scheduling model achieved a Mean Absolute Error (MAE) of 4.2 operating days in RUL prediction, an Area Under the ROC Curve (AUROC) of 0.942 for early failure detection, and reduced unplanned equipment downtime by 48.5%, generating $22.4M in net annual maintenance cost savings. We present an exhaustive quantitative synthesis incorporating 10 data tables, 10 mathematical behavior graphs, and 20 distinct chart architectures detailing degradation paths, opportunistic scheduling yield, and reliability capital optimization.
Zitieren
APA
Ahmed, M. S., & Hasan, M. (2026). Predictive Maintenance Scheduling for Heavy Manufacturing Equipment Based on Sensor Degradation Curves. Journal of Business Intelligence & Decision Science Review, 1. https://doi.org/10.69013/re3483pr
Vancouver
Ahmed MS, Hasan M. Predictive Maintenance Scheduling for Heavy Manufacturing Equipment Based on Sensor Degradation Curves. Journal of Business Intelligence & Decision Science Review. 2026:1. doi:10.69013/re3483pr
BibTeX
@article{Ahmed2026,
author = {Ahmed, MD Shamim and Hasan, Mahady},
title = {Predictive Maintenance Scheduling for Heavy Manufacturing Equipment Based on Sensor Degradation Curves},
journal = {Journal of Business Intelligence & Decision Science Review},
year = {2026},
pages = {1},
doi = {10.69013/re3483pr}
}
EUVIMED