Risk Assessment of Towage Operations at Penang Port: A Hazid-Based Survey and Priority Analysis
Applied Skills and Knowledge Journal · 01.12.2026 · 1 (1) · 220-229
DOI: 10.68949/askjv01i01a018 ↗Kurz gefasst
Fachartikel in der Zeitschrift Applied Skills and Knowledge Journal, online erschienen am 01.12.2026. Verfasst von Rafiq Hanif Mohd Asri und 1 weiteren Autor:innen.
Abstract (Originalsprache)
Harbour towage involves simultaneous navigational, environmental, mechanical and human-factor hazards, particularly when tugs and towed vessels manoeuvre in confined waters. This study examines perceived risks associated with towing operations at Penang Port using hazard identification (HAZID) and a semi-quantitative likelihood–severity matrix. Ten maritime stakeholders supplied ratings for five hazard categories, yielding 50 paired likelihood and severity evaluations. Risk scores were calculated as the product of the two ordinal ratings and summarised descriptively. Navigational hazards received the highest mean score (16.6), followed by weather conditions (15.7), equipment failure (13.6), crew error (11.6) and communication failure (11.3). These results identify respondents’ relative priorities; they are not observed frequencies or validated incident probabilities. The study integrates a focused review of formal safety assessment, towage-specific incidents and applicable safety-management principles to propose targeted controls covering passage planning, weather assessment, equipment assurance, communication, crew competence and emergency response. Because incident exposure, tow configuration, observational records and risk-acceptance thresholds were not available for independent assessment, the proposed measures are presented as risk-management priorities requiring site-specific verification. This approach provides a transparent basis for further towage-safety evaluation at Penang Port while preserving the distinction between expert judgments and demonstrated operational effectiveness.
Zitieren
APA
Asri, R. H. M., & Rahmatdin, M. N. (2026). Risk Assessment of Towage Operations at Penang Port: A Hazid-Based Survey and Priority Analysis. Applied Skills and Knowledge Journal, 1(1), 220-229. https://doi.org/10.68949/askjv01i01a018
Vancouver
Asri RHM, Rahmatdin MN. Risk Assessment of Towage Operations at Penang Port: A Hazid-Based Survey and Priority Analysis. Applied Skills and Knowledge Journal. 2026;1(1):220-229. doi:10.68949/askjv01i01a018
BibTeX
@article{Asri2026,
author = {Asri, Rafiq Hanif Mohd and Rahmatdin, Muhamad Nasir},
title = {Risk Assessment of Towage Operations at Penang Port: A Hazid-Based Survey and Priority Analysis},
journal = {Applied Skills and Knowledge Journal},
year = {2026},
volume = {1},
number = {1},
pages = {220--229},
doi = {10.68949/askjv01i01a018}
}
EUVIMED