EUVIMEDEUVIMED entdecken
Crossref

An Assessment of Current State of Risk Management and its Practices in Afghanistan Construction Projects

MOHAMMAD NASER AMIN, MOHAMMAD ALEM WARDAK, AMANULLAH FAQIRI

Kabul Polytechnic University International Journal of Engineering & Technology · 30.03.2026 · 6 (1) · 13-34

DOI: 10.68924/z808cy27 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Kabul Polytechnic University International Journal of Engineering & Technology, online erschienen am 30.03.2026. Verfasst von MOHAMMAD NASER AMIN und 2 weiteren Autor:innen.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

In Afghanistan, construction projects face risks and uncertainties in their entire lifecycle from initiation to handover and operation. This is mainly because risk management in Afghanistan’s construction sector remains underdeveloped, limited to documentation, and is not embedded into all stages of project development. Through review of current literature and academic studies, this paper assesses the current state of risk management and its practices in Afghanistan construction projects. Within the local context of Afghanistan, it analyses key risk factors—such as cost escalation, time delays, technical errors, safety deficiencies, quality defects, environmental issues, and legal disputes. The paper further assesses how risk identification, risk assessment, and risk mitigation strategies are applied in Afghan construction practice compared to international standards and practices. A questionnaire survey was also conducted among engineers, staff, and project managers working in three active building construction projects and two active road construction projects to complement the review and capture perceptions of critical risks and current risk management approaches. The questionnaire concentrates on risk identification, risk assessment, risk allocation & response, and risk monitoring & control practices in these ongoing projects. The findings reveal an increased awareness about management principles; however, the overall consistent application of proactive and structured/systematic risk management practices remains limited. Projects rely on inconsistent personal experience-based methods instead of adopting recognised standards such as ISO 31000 or PMBOK. The study ends with recommendations for developing a standardised national approach to enhance efficiency, safety, and sustainability in Afghanistan’s construction sector.

Zitieren

APA

AMIN, M. N., WARDAK, M. A., & FAQIRI, A. (2026). An Assessment of Current State of Risk Management and its Practices in Afghanistan Construction Projects. Kabul Polytechnic University International Journal of Engineering & Technology, 6(1), 13-34. https://doi.org/10.68924/z808cy27

Vancouver

AMIN MN, WARDAK MA, FAQIRI A. An Assessment of Current State of Risk Management and its Practices in Afghanistan Construction Projects. Kabul Polytechnic University International Journal of Engineering & Technology. 2026;6(1):13-34. doi:10.68924/z808cy27

BibTeX
@article{AMIN2026,
  author = {AMIN, MOHAMMAD NASER and WARDAK, MOHAMMAD ALEM and FAQIRI, AMANULLAH},
  title = {An Assessment of Current State of Risk Management and its Practices in Afghanistan Construction Projects},
  journal = {Kabul Polytechnic University International Journal of Engineering & Technology},
  year = {2026},
  volume = {6},
  number = {1},
  pages = {13--34},
  doi = {10.68924/z808cy27}
}
Kostenlos starten →