EUVIMEDEUVIMED entdecken
Crossref

Investigation the Impact of Weak Monitoring and Evaluation in Afghanistan's Construction Projects

MOHAMMAD KHALID ZIARMAL, MOHAMMAD ALEM WARDAK

Kabul Polytechnic University International Journal of Engineering & Technology · 07.11.2026 · 6 (2) · 71-96

DOI: 10.68924/79ns3557 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Kabul Polytechnic University International Journal of Engineering & Technology, online erschienen am 07.11.2026. Verfasst von MOHAMMAD KHALID ZIARMAL und 1 weiteren Autor:innen.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Due to over three decades of conflict and instability, Afghanistan has lost much of its economic, infrastructural, and public utility foundations. Given the country's current situation, there is a heavy reliance on international aid and foreign financial sources for funding major infrastructure and public development projects, as internal revenues remain insufficient. Implementing such large-scale construction projects requires significant investment, making it essential to establish effective monitoring and evaluation (M&E) systems during both the planning and implementation phases to prevent potential challenges. Effective M&E plays a critical role in ensuring the success and quality of construction projects. It helps track project progress, maintain quality standards, manage risks, and ensure that projects remain within budget. When properly implemented, M&E can lead to positive and successful project outcomes. However, weak M&E often leads to poor implementation of planned activities, project delays, and increased costs. Inadequate evaluation fails to detect construction defects, compromising the structural integrity of buildings and infrastructure. Poor supervision results in substandard workmanship, leading to rapid deterioration and the need for costly repairs and reconstruction. Another major consequence of weak M&E is financial mismanagement. Without proper oversight, budgets may be exceeded due to unforeseen expenses, corruption, or misallocation of resources, causing financial losses to stakeholders and, in some cases, project abandonment. Furthermore, a lack of effective M&E can lead to legal complications, delays in documentation, and unverified or unapproved project activities such as incomplete design modifications, missing material test reports, and unrecorded changes in daily construction activities. This study aims to investigate the impacts of weak M&E in Afghanistan’s construction projects and analyze its consequences while recommending strategic solutions to enhance the monitoring and evaluation process. By identifying core challenges and proposing strategic reforms, the study seeks to support the implementation of cost-effective, high-quality, and sustainable infrastructure projects across the country.

Zitieren

APA

ZIARMAL, M. K., & WARDAK, M. A. (2026). Investigation the Impact of Weak Monitoring and Evaluation in Afghanistan's Construction Projects. Kabul Polytechnic University International Journal of Engineering & Technology, 6(2), 71-96. https://doi.org/10.68924/79ns3557

Vancouver

ZIARMAL MK, WARDAK MA. Investigation the Impact of Weak Monitoring and Evaluation in Afghanistan's Construction Projects. Kabul Polytechnic University International Journal of Engineering & Technology. 2026;6(2):71-96. doi:10.68924/79ns3557

BibTeX
@article{ZIARMAL2026,
  author = {ZIARMAL, MOHAMMAD KHALID and WARDAK, MOHAMMAD ALEM},
  title = {Investigation the Impact of Weak Monitoring and Evaluation in Afghanistan's Construction Projects},
  journal = {Kabul Polytechnic University International Journal of Engineering & Technology},
  year = {2026},
  volume = {6},
  number = {2},
  pages = {71--96},
  doi = {10.68924/79ns3557}
}
Kostenlos starten →