From Awareness to Implementation: BIM–IoT Adoption Gaps, Barriers and a Context-Sensitive Framework for Nigerian Construction Projects
British Journal of Advanced Research · 10.11.2026 · 1 (5)
DOI: 10.68263/bjar-r8ndyryz ↗Kurz gefasst
Fachartikel in der Zeitschrift British Journal of Advanced Research, online erschienen am 10.11.2026. Verfasst von Babangida Ruma Kabir und 2 weiteren Autor:innen.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Zitieren
APA
Kabir, B. R., Musa, M. J., & Aliyu, M. S. (2026). From Awareness to Implementation: BIM–IoT Adoption Gaps, Barriers and a Context-Sensitive Framework for Nigerian Construction Projects. British Journal of Advanced Research, 1(5). https://doi.org/10.68263/bjar-r8ndyryz
Vancouver
Kabir BR, Musa MJ, Aliyu MS. From Awareness to Implementation: BIM–IoT Adoption Gaps, Barriers and a Context-Sensitive Framework for Nigerian Construction Projects. British Journal of Advanced Research. 2026;1(5). doi:10.68263/bjar-r8ndyryz
BibTeX
@article{Kabir2026,
author = {Kabir, Babangida Ruma and Musa, Mu’azu Jibrin and Aliyu, Muhammad Surajo},
title = {From Awareness to Implementation: BIM–IoT Adoption Gaps, Barriers and a Context-Sensitive Framework for Nigerian Construction Projects},
journal = {British Journal of Advanced Research},
year = {2026},
volume = {1},
number = {5},
doi = {10.68263/bjar-r8ndyryz}
}
EUVIMED