Hydro-Power Energy Recovery in Water Pipelines Networks, A Case Study of Man-Made River in Libya
Libya Journal of Applied Sciences and Technology · 30.06.2026 · 14 (1) · 51-66
DOI: 10.67652/ljast.v14i1.92 ↗Kurz gefasst
Fachartikel in der Zeitschrift Libya Journal of Applied Sciences and Technology, online erschienen am 30.06.2026. Verfasst von Ahmed Sahab und 2 weiteren Autor:innen. Die Arbeit nennt 8 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY-NC 4.0).
Abstract (Originalsprache)
The Man-Made River (MMR) in Libya is one of the world’s largest water transfer systems, yet it consumes vast amounts of electricity to deliver water across long distances. This research addresses the challenge of energy demand by exploring the recovery of hydraulic energy that is normally wasted as pressure losses within the MMR pipelines. A hydraulic model of the pipeline was developed using EPANET, with actual design data serving as input. Four operational scenarios were evaluated (1.2, 1.3, 2.0, and 2.5 MCMD), and the results were analyzed to estimate recoverable energy and identify suitable turbine types. The methodology included simulation of head and pressure distributions, energy recovery calculations, and comparison with the system’s electricity consumption. The study found that at current operating flows (1.2–1.3 MCMD), turbines could recover between 686 and 733 MWh/day, meeting nearly half of the system’s electricity demand. At the original design capacity of 2.0 MCMD, recovery declined to about 610 MWh/day, while at 2.5 MCMD the net gain dropped to only 117 MWh/day due to pumping requirements. Francis turbines were identified as the most practical technology, with Pelton turbines as secondary options in high-head conditions. The research demonstrates that hydropower recovery from the MMR is technically feasible and environmentally beneficial. It could substantially reduce CO₂ emissions and strengthen Libya’s energy security by integrating renewable power directly into the national grid.
Zitieren
APA
Sahab, A., Eraghubi, M., & Hassin, O. (2026). Hydro-Power Energy Recovery in Water Pipelines Networks, A Case Study of Man-Made River in Libya. Libya Journal of Applied Sciences and Technology, 14(1), 51-66. https://doi.org/10.67652/ljast.v14i1.92
Vancouver
Sahab A, Eraghubi M, Hassin O. Hydro-Power Energy Recovery in Water Pipelines Networks, A Case Study of Man-Made River in Libya. Libya Journal of Applied Sciences and Technology. 2026;14(1):51-66. doi:10.67652/ljast.v14i1.92
BibTeX
@article{Sahab2026,
author = {Sahab, Ahmed and Eraghubi, Munir and Hassin, Osama},
title = {Hydro-Power Energy Recovery in Water Pipelines Networks, A Case Study of Man-Made River in Libya},
journal = {Libya Journal of Applied Sciences and Technology},
year = {2026},
volume = {14},
number = {1},
pages = {51--66},
doi = {10.67652/ljast.v14i1.92}
}
EUVIMED