EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Role of Early Risk Identification in Reducing Project Delays and Cost Overruns

Kartavya Patil, Nishant Patil

International Research Journal of Innovation in Science and Technology · 2026

DOI: 10.67308/irjist.049 ↗

Kurz gefasst

Fachartikel in der Zeitschrift International Research Journal of Innovation in Science and Technology, 2026. Verfasst von Kartavya Patil und 1 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Project delays and cost overruns continue to affect construction, infrastructure, transportation, and information technology projects across the world. Studies conducted over the past two decades indicate that a large percentage of projects exceed planned cost and schedule targets due to inadequate planning, weak governance, and ineffective risk management practices. This paper presents a systematic review of the role of Early Risk Identification (ERI) in reducing project delays and cost overruns using published industry reports, project management studies, and global datasets from 2005–2025. The review examines the causes of project overruns, traditional and modern risk identification techniques, sector-specific evidence, and the growing role of technologies such as Artificial Intelligence (AI), Building Information Modelling (BIM), and digital twins in project risk management. The study also discusses behavioural and organizational barriers including optimism bias, weak stakeholder coordination, and delayed decision-making. The findings suggest that proactive risk identification significantly improves project performance by reducing schedule delays, improving cost control, and strengthening project governance. The paper concludes with practical recommendations for implementing structured ERI frameworks in modern project environments.

Zitieren

APA

Patil, K., & Patil, N. (2026). Role of Early Risk Identification in Reducing Project Delays and Cost Overruns. International Research Journal of Innovation in Science and Technology. https://doi.org/10.67308/irjist.049

Vancouver

Patil K, Patil N. Role of Early Risk Identification in Reducing Project Delays and Cost Overruns. International Research Journal of Innovation in Science and Technology. 2026. doi:10.67308/irjist.049

BibTeX
@article{Patil2026,
  author = {Patil, Kartavya and Patil, Nishant},
  title = {Role of Early Risk Identification in Reducing Project Delays and Cost Overruns},
  journal = {International Research Journal of Innovation in Science and Technology},
  year = {2026},
  doi = {10.67308/irjist.049}
}
Kostenlos starten →