Self-Propelled Working Platform for Demolition and Dismantling
Mining Report · 18.05.2026 · 162 (2)
DOI: 10.66356/phri9456 ↗Kurz gefasst
Fachartikel in der Zeitschrift Mining Report, online erschienen am 18.05.2026. Verfasst von Patrick Bädke.
Abstract (Originalsprache)
A self-propelled working platform was developed for the decommissioning work at the Isar 1 nuclear power plant, combining high positioning accuracy for milling work with conventional concrete demolition in a single system. A key feature is its modular design, which can be adapted to different geometries. This made it possible to minimise the volume of milled material requiring final disposal and the associated costs.
Zitieren
APA
Bädke, P. (2026). Self-Propelled Working Platform for Demolition and Dismantling. Mining Report, 162(2). https://doi.org/10.66356/phri9456
Vancouver
Bädke P. Self-Propelled Working Platform for Demolition and Dismantling. Mining Report. 2026;162(2). doi:10.66356/phri9456
BibTeX
@article{Bdke2026,
author = {Bädke, Patrick},
title = {Self-Propelled Working Platform for Demolition and Dismantling},
journal = {Mining Report},
year = {2026},
volume = {162},
number = {2},
doi = {10.66356/phri9456}
}
EUVIMED