数据驱动下建筑部品智能产线协同控制与调度耦合机理及集成优化研究(Research on the Coupling Mechanism and Integrated Optimization of Collaborative Control and Scheduling for Intelligent Production Lines of Prefabricated Building Components: A Data-Driven Approach)
研究生(Graduate students) · 2026
DOI: 10.66106/yanjai.20260104 ↗Kurz gefasst
Fachartikel in der Zeitschrift 研究生(Graduate students), 2026. Verfasst von 牛思琦 Siqi Niu und 1 weiteren Autor:innen. Die Arbeit nennt 1 Literaturangaben.
Abstract (Originalsprache)
Collaborative control and production scheduling in intelligent production lines for prefabricated building components have traditionally been investigated separately. The former addresses the timing and safety of operations at the action level, whereas the latter focuses on task allocation and sequencing at the scheduling level. In actual production, however, these two processes are mutually interdependent. The table-release sequence determined by the scheduling process establishes the initial conditions for collaborative control, while the operation durations and interlock-induced waiting times determined by collaborative control, in turn, constrain the feasible region of the scheduling problem. Treating these processes independently can lead to two types of problems: schedules that are feasible in principle but result in operational conflicts, and operations that proceed smoothly despite suboptimal schedules. This study decomposes the coupling between collaborative control and production scheduling into three dimensions: temporal coordination, resource compatibility, and operational safety. It establishes compatibility conditions for each dimension and demonstrates that scheduling feasibility is not an intrinsic property of task sequencing alone, but rather a joint property of task sequencing and operational timing. Building on this analysis, a hierarchical iterative framework for integrated optimization is proposed. At the scheduling level, an initial solution is obtained under relaxed constraints. At the collaborative control level, the compatibility of this solution is verified, and the resulting operational durations and conflict information are fed back to the scheduling level. Structural conflicts are translated into sequencing prohibitions,strengthened capacity constraints, or time-window constraints, which are then incorporated into the scheduling model for re-optimization. This iterative process continues until the solutions at the two levels are consistent or a termination criterion is met. Finally, the data interfaces required by the proposed framework, the types of production lines to which it applies,and the circumstances under which it may fail are discussed.
Zitieren
APA
Niu, 牛. S., & Ma, 马. J. (2026). 数据驱动下建筑部品智能产线协同控制与调度耦合机理及集成优化研究(Research on the Coupling Mechanism and Integrated Optimization of Collaborative Control and Scheduling for Intelligent Production Lines of Prefabricated Building Components: A Data-Driven Approach). 研究生(Graduate students). https://doi.org/10.66106/yanjai.20260104
Vancouver
Niu 牛S, Ma 马J. 数据驱动下建筑部品智能产线协同控制与调度耦合机理及集成优化研究(Research on the Coupling Mechanism and Integrated Optimization of Collaborative Control and Scheduling for Intelligent Production Lines of Prefabricated Building Components: A Data-Driven Approach). 研究生(Graduate students). 2026. doi:10.66106/yanjai.20260104
BibTeX
@article{Niu2026,
author = {Niu, 牛思琦 Siqi and Ma, 马健 Jian},
title = {数据驱动下建筑部品智能产线协同控制与调度耦合机理及集成优化研究(Research on the Coupling Mechanism and Integrated Optimization of Collaborative Control and Scheduling for Intelligent Production Lines of Prefabricated Building Components: A Data-Driven Approach)},
journal = {研究生(Graduate students)},
year = {2026},
doi = {10.66106/yanjai.20260104}
}
EUVIMED