An Analysis of Critical Management Factors for Design Value Engineering Work Focused on Medical Facilities Construction Projects
Journal of Architectural and Planning Research · 30.06.2026 · 40 (2) · 48-59
DOI: 10.66033/japr2026-204 ↗Kurz gefasst
Fachartikel in der Zeitschrift Journal of Architectural and Planning Research, online erschienen am 30.06.2026. Verfasst von Jinkook Yang.
Abstract (Originalsprache)
The demand for medical facilities is increasing due to an aging society. Medical facilities require systematic project management compared to other construction projects. Reflecting this situation, the construction management (CM) contract system is being applied to medical facilities construction projects. Construction management can perform systematic project management as the agent of the owner. In particular, construction management provides a system-based control system during the whole project life cycle period. In addition, the construction management system can optimize the contract management and the design management as well as construction control and maintenance. The design management work is a differentiated function of the construction management system. The design management work can be divided into design review and design value engineering (VE). The design value engineering technique can reduce the project budget as well as increase the performance of the design. In particular, in the case of medical facilities, which are the subject of this study, systematic implementation of design value engineering is required due to the complexity and diversity of projects. However, research on medical facilities design value engineering is insufficient. This study extracted 45 critical management factors based on a case analysis and expert interviews of medical facilities value engineering. Next, AHP analysis, a hierarchical analysis technique, was conducted to analyze the relative importance of the extracted factors. AHP analysis was conducted on 22 VE experts, and the consistency index (CI) of all survey response results was less than 0.1, indicating that consistency was secured. In the basic design VE phase, the results showed that the consider the flexibility with architecture space was the highest at 0.422, followed by the moving-line plan of centering medical personnel and patient at 0.269. In addition, in the execution design VE phase, the checking interference item between every field (Spatial size, alignment location, scale of electric power) was the highest at 0.483, followed by the facility of application the project site at 0.247. The presented results are expected to help apply design value engineering to efficiently perform the continuously increasing design management of medical facilities.
Zitieren
APA
Yang, J. (2026). An Analysis of Critical Management Factors for Design Value Engineering Work Focused on Medical Facilities Construction Projects. Journal of Architectural and Planning Research, 40(2), 48-59. https://doi.org/10.66033/japr2026-204
Vancouver
Yang J. An Analysis of Critical Management Factors for Design Value Engineering Work Focused on Medical Facilities Construction Projects. Journal of Architectural and Planning Research. 2026;40(2):48-59. doi:10.66033/japr2026-204
BibTeX
@article{Yang2026,
author = {Yang, Jinkook},
title = {An Analysis of Critical Management Factors for Design Value Engineering Work Focused on Medical Facilities Construction Projects},
journal = {Journal of Architectural and Planning Research},
year = {2026},
volume = {40},
number = {2},
pages = {48--59},
doi = {10.66033/japr2026-204}
}