Risk Analysis to Improve Procurement Time Performance of the Construction Services Project of Air Traffic Control (ATC) Tower and Supporting Facilities

Bagus Adi Prabowo, Wisnu Isvara, Titi Sari Nurul Rachmawati

Journal of Project Management Research · 31.07.2026 · 2 (1) · 19-38

DOI: 10.65303/journalpmresearch.v2i1.61 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Journal of Project Management Research, online erschienen am 31.07.2026. Verfasst von Bagus Adi Prabowo und 2 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The implementation of the procurement process for the construction services of the ATC Tower and Supporting Facilities at Perum XYZ is expected to be completed on time with the delivery of the ATC Tower infrastructure and Supporting Facilities to support optimal flight navigation services. However, in the period 2016-2023, obstacles occurred at several project locations which caused the benefits of the project development to be delayed. This study aims to analyze the dominant risk factors that affect the performance of the procurement time for the construction services of the ATC Tower and Supporting Facilities at Perum XYZ. Risk identification was carried out through literature studies and then validated by experts. Furthermore, the risks were submitted to respondents who had been involved in the procurement of construction services for the ATC Tower and Supporting Facilities at Perum XYZ and then a risk analysis was carried out by referring to the company's internal regulations related to the Company's Risk Management Policy and Guidelines. From the results of data collection and analysis, it was found that there were 5 dominant risk factors with a high risk level that affected the procurement time performance. The results of this study can be a basis for determining the development of a procurement strategy for the construction services of the ATC Tower and Supporting Facilities at Perum XYZ in improving procurement time performance

Zitieren

APA

Prabowo, B. A., Isvara, W., & Rachmawati, T. S. N. (2026). Risk Analysis to Improve Procurement Time Performance of the Construction Services Project of Air Traffic Control (ATC) Tower and Supporting Facilities. Journal of Project Management Research, 2(1), 19-38. https://doi.org/10.65303/journalpmresearch.v2i1.61

Vancouver

Prabowo BA, Isvara W, Rachmawati TSN. Risk Analysis to Improve Procurement Time Performance of the Construction Services Project of Air Traffic Control (ATC) Tower and Supporting Facilities. Journal of Project Management Research. 2026;2(1):19-38. doi:10.65303/journalpmresearch.v2i1.61

BibTeX
@article{Prabowo2026,
  author = {Prabowo, Bagus Adi and Isvara, Wisnu and Rachmawati, Titi Sari Nurul},
  title = {Risk Analysis to Improve Procurement Time Performance of the Construction Services Project of Air Traffic Control (ATC) Tower and Supporting Facilities},
  journal = {Journal of Project Management Research},
  year = {2026},
  volume = {2},
  number = {1},
  pages = {19--38},
  doi = {10.65303/journalpmresearch.v2i1.61}
}
Kostenlos starten →