EUVIMEDEUVIMED entdecken
Crossref

Research on Optimization of Construction Management Mode and Multi-Professional Collaborative Operation of Sludge Incineration Project Based on BIM Technology

Yang Zhou

Ingegneria Sismica · 30.04.2026 · 42 (4) · 1-20

DOI: 10.65102/is2026168 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Ingegneria Sismica, online erschienen am 30.04.2026. Verfasst von Yang Zhou.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

This paper combines BIM visualization technology with the construction requirements of sludge incineration project design drawings to construct the various components of the sludge incineration treatment system and the BIM model of the sludge incineration system. The collision detection function of BIM technology is used to assist in reviewing construction design drawings, thereby reducing errors and conflict risks during the construction process. Additionally, the BIM model of the sludge incineration system is used to statistically analyze and calculate the data of each component, thereby estimating the engineering volume required for the construction of the sludge treatment system. By integrating the BIM intelligent management platform and referencing established standards, multi-disciplinary collaborative design is conducted for system units such as the sludge reception and storage system and the drying system within the process. Based on the actual expansion requirements of the sludge treatment plant, the construction and operational results of the sludge incineration project supported by BIM technology are calculated. The system trial operation results of the sludge incineration project meet construction requirements, and the continuous operation results of the disposal process also meet standards. No faults occurred during the entire continuous operation period, achieving efficient and stable operation of the project. The daily average processing capacity for sludge with 80% moisture content reaches 873.4 tons, while the daily average production of dried sludge is 186.3 tons, both meeting the design requirements for stable processing capacity and annual cumulative operation time.

Zitieren

APA

Zhou, Y. (2026). Research on Optimization of Construction Management Mode and Multi-Professional Collaborative Operation of Sludge Incineration Project Based on BIM Technology. Ingegneria Sismica, 42(4), 1-20. https://doi.org/10.65102/is2026168

Vancouver

Zhou Y. Research on Optimization of Construction Management Mode and Multi-Professional Collaborative Operation of Sludge Incineration Project Based on BIM Technology. Ingegneria Sismica. 2026;42(4):1-20. doi:10.65102/is2026168

BibTeX
@article{Zhou2026,
  author = {Zhou, Yang},
  title = {Research on Optimization of Construction Management Mode and Multi-Professional Collaborative Operation of Sludge Incineration Project Based on BIM Technology},
  journal = {Ingegneria Sismica},
  year = {2026},
  volume = {42},
  number = {4},
  pages = {1--20},
  doi = {10.65102/is2026168}
}
Kostenlos starten →