Crossref
Seecant piling and soft ground improvement techniques used in Slope stabilization & tunnelling: A case study from Sivok-Rangpo Rail Link Project
Journal of Engineering Geology · 15.06.2026 · 49 (2) · 267-287
DOI: 10.64944/iseg-j49/02/21 ↗Kurz gefasst
Fachartikel in der Zeitschrift Journal of Engineering Geology, online erschienen am 15.06.2026.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Zitieren
APA
(2026). Seecant piling and soft ground improvement techniques used in Slope stabilization & tunnelling: A case study from Sivok-Rangpo Rail Link Project. Journal of Engineering Geology, 49(2), 267-287. https://doi.org/10.64944/iseg-j49/02/21
Vancouver
Seecant piling and soft ground improvement techniques used in Slope stabilization & tunnelling: A case study from Sivok-Rangpo Rail Link Project. Journal of Engineering Geology. 2026;49(2):267-287. doi:10.64944/iseg-j49/02/21
BibTeX
@article{euvimed2026,
title = {Seecant piling and soft ground improvement techniques used in Slope stabilization & tunnelling: A case study from Sivok-Rangpo Rail Link Project},
journal = {Journal of Engineering Geology},
year = {2026},
volume = {49},
number = {2},
pages = {267--287},
doi = {10.64944/iseg-j49/02/21}
}
EUVIMED