EUVIMEDEUVIMED entdecken
Crossref

An Integrated Digital Project Controls and Risk Management Framework for Reducing Delay in Major Infrastructure Projects: A Construction Management Approach for Saudi Arabia

Nadeem Akram

Iconic Research and Engineering Journals · 31.10.2026 · 10 (4) · 5214-5236

DOI: 10.64388/ire1724279 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Iconic Research and Engineering Journals, online erschienen am 31.10.2026. Verfasst von Nadeem Akram.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Kein Abstract verfügbar.

Zitieren

APA

Akram, N. (2026). An Integrated Digital Project Controls and Risk Management Framework for Reducing Delay in Major Infrastructure Projects: A Construction Management Approach for Saudi Arabia. Iconic Research and Engineering Journals, 10(4), 5214-5236. https://doi.org/10.64388/ire1724279

Vancouver

Akram N. An Integrated Digital Project Controls and Risk Management Framework for Reducing Delay in Major Infrastructure Projects: A Construction Management Approach for Saudi Arabia. Iconic Research and Engineering Journals. 2026;10(4):5214-5236. doi:10.64388/ire1724279

BibTeX
@article{Akram2026,
  author = {Akram, Nadeem},
  title = {An Integrated Digital Project Controls and Risk Management Framework for Reducing Delay in Major Infrastructure Projects: A Construction Management Approach for Saudi Arabia},
  journal = {Iconic Research and Engineering Journals},
  year = {2026},
  volume = {10},
  number = {4},
  pages = {5214--5236},
  doi = {10.64388/ire1724279}
}
Kostenlos starten →