A Linear Programming Model for Equitable Humanitarian Resource Allocation Under Demand Uncertainty
BIMA JOURNAL OF SCIENCE AND TECHNOLOGY GOMBE · 30.07.2026 · 10 (3) · 236-250
DOI: 10.64290/bima.v10i3.1684 ↗Kurz gefasst
Fachartikel in der Zeitschrift BIMA JOURNAL OF SCIENCE AND TECHNOLOGY GOMBE, online erschienen am 30.07.2026. Verfasst von Arahyel Aliyu und 2 weiteren Autor:innen.
Abstract (Originalsprache)
Humanitarian agencies must allocate limited food stocks across locations where demand is uncertain and road access is costly and insecure. This study compares a deterministic linear program (DLP) with a robust linear program (RLP) for food-aid distribution in the World Food Programme network in Borno, Adamawa, and Yobe (BAY) States, Nigeria. The network has three supply hubs and seven demand locations. Demand lies in an interval between a nominal value and an upper bound, and an equity parameter θ sets the share of each location’s upper-bound demand that must be delivered. The principal robust case uses θ = 1.00, so every upper-bound demand is met in full. Hub capacities, uncertainty coefficients and route costs are model inputs built from secondary sources and stated assumptions, not field measurements. The DLP costs $326,932.50 for nominal demand of 8,100 MT. If that plan is kept fixed and demand reaches its upper bound of 10,661.25 MT, it delivers 75.98% of the requirement and leaves 2,561.25 MT unserved. The RLP with θ = 1.00 costs $610,937.56 and leaves no shortfall, a Price of Robustness of 86.87%. Of the $284,005.06 difference, $106,868.25 is the cost of delivering the extra 2,561.25 MT over the same least-cost local routes, and $177,136.81 arises because 711.25 MT must travel from Damaturu to Monguno once the Maiduguri hub is full. A partial-coverage case with θ = 0.70 costs $303,660.53 and covers 70% of upper-bound demand (7,462.88 MT). Cost rises by about $43,380 for each 0.10 increase in θ up to 0.80, and rises faster beyond θ ≈ 0.875, where the Maiduguri hub reaches capacity. The Maiduguri capacity constraint has a shadow price of $249.05 per MT, which holds between 4,963.75 and 5,711.25 MT of capacity. The results apply to the stated inputs and are not forecasts.
Zitieren
APA
Aliyu, A., Oyewola, D. O., & Mohammed, M. B. (2026). A Linear Programming Model for Equitable Humanitarian Resource Allocation Under Demand Uncertainty. BIMA JOURNAL OF SCIENCE AND TECHNOLOGY GOMBE, 10(3), 236-250. https://doi.org/10.64290/bima.v10i3.1684
Vancouver
Aliyu A, Oyewola DO, Mohammed MB. A Linear Programming Model for Equitable Humanitarian Resource Allocation Under Demand Uncertainty. BIMA JOURNAL OF SCIENCE AND TECHNOLOGY GOMBE. 2026;10(3):236-250. doi:10.64290/bima.v10i3.1684
BibTeX
@article{Aliyu2026,
author = {Aliyu, Arahyel and Oyewola, David Opeoluwa and Mohammed, M. B.},
title = {A Linear Programming Model for Equitable Humanitarian Resource Allocation Under Demand Uncertainty},
journal = {BIMA JOURNAL OF SCIENCE AND TECHNOLOGY GOMBE},
year = {2026},
volume = {10},
number = {3},
pages = {236--250},
doi = {10.64290/bima.v10i3.1684}
}
EUVIMED