Beyond the Bid: How Engineering Uncertainty Undermines the Commercial Viability of Mega Infrastructure Projects — A Critical Examination of the EPC Model

Yuhong Jiang

Economics & Business Management · 30.10.2026 · 7 (2) · 145

DOI: 10.63313/ebm.9233 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Economics & Business Management, online erschienen am 30.10.2026. Verfasst von Yuhong Jiang. Die Arbeit nennt 20 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY-SA 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The Engineer-Procure-Construct (EPC) model has become a dominant project delivery method for large-scale infrastructure projects globally. While existing research has extensively documented cost and schedule overruns in EPC projects, limited attention has been paid to how engineering uncertainties systematically undermine projects' commercial viability assessments. This study, drawing upon 60 large-scale engineering projects analyzed by Miller and Hobbs (2005) and extended case evidence from transportation, energy, and industrial mega projects across multiple jurisdictions, investigates the transmission mechanisms through which geological uncertainty, supply chain disruptions, and institutional complexity render initial commercial feasibility assessments obsolete. The study proposes a conceptual model of "business case resilience," comprising three interdependent factors: uncertainty absorption capacity, information feedback rate, and institutional adjustment space. Findings suggest that while the EPC model demonstrates superior performance in managing routine engineering interfaces (design–construction coordination), the model exhibits structural vulnerability when confronting "Knightian uncertainties"—situations where the probability distribution of outcomes is itself unknown. The paper concludes with a decision framework for matching project delivery models to uncertainty profiles and practical recommendations for incorporating controlled flexibility into EPC contractual structures.

Zitieren

APA

Jiang, Y. (2026). Beyond the Bid: How Engineering Uncertainty Undermines the Commercial Viability of Mega Infrastructure Projects — A Critical Examination of the EPC Model. Economics & Business Management, 7(2), 145. https://doi.org/10.63313/ebm.9233

Vancouver

Jiang Y. Beyond the Bid: How Engineering Uncertainty Undermines the Commercial Viability of Mega Infrastructure Projects — A Critical Examination of the EPC Model. Economics & Business Management. 2026;7(2):145. doi:10.63313/ebm.9233

BibTeX
@article{Jiang2026,
  author = {Jiang, Yuhong},
  title = {Beyond the Bid: How Engineering Uncertainty Undermines the Commercial Viability of Mega Infrastructure Projects — A Critical Examination of the EPC Model},
  journal = {Economics & Business Management},
  year = {2026},
  volume = {7},
  number = {2},
  pages = {145},
  doi = {10.63313/ebm.9233}
}
Kostenlos starten →