Impact of Predictive Arc-Flash Mitigation on Safety, Downtime, and Retrofit Efficiency in U.S. Manufacturing Power Systems
American Journal of Data Science and Analytics · 01.06.2026 · 07 (06) · 182-199
DOI: 10.63125/855hx414 ↗Kurz gefasst
Fachartikel in der Zeitschrift American Journal of Data Science and Analytics, online erschienen am 01.06.2026. Verfasst von Mohammad Shoriful Hossan Shohel.
Abstract (Originalsprache)
An arc flash releases its energy in milliseconds, a burst of heat, light, and pressure that can injure a worker standing at an electrical panel before a conventional protective device has finished deciding to trip. In U.S. manufacturing plants, where aging switchgear sits close to people and production alike, this split-second hazard has long been managed reactively, through protective equipment worn in case the worst happens and periodic studies filed and shelved. This study examines a different posture: predictive arc-flash mitigation, in which sensing, diagnostics, and fast adaptive protection work together to anticipate and clear a fault before it becomes an injury. Rather than asking whether one relay or sensor performs, the study asks what makes a plant's whole predictive-mitigation capability effective across three outcomes that plant managers weigh together, worker safety, production downtime, and the efficiency of retrofitting older systems. It models worker safety outcome effectiveness as a function of six capabilities: arc-flash hazard characterization and incident-energy modeling, predictive fault sensing and diagnostics, adaptive protection and fast tripping, retrofit design and integration efficiency, downtime and operational-continuity impact, and an integrating construct of predictive mitigation maturity. Evidence came from a structured five-point Likert survey completed by 152 valid respondents out of 170 distributed, an 89.4% valid response rate, drawn from electrical and power engineers, plant maintenance and reliability staff, EHS and safety managers, protection and controls specialists, and facilities managers, of whom 69.1% worked directly with power-system protection or plant electrical safety. The data were analyzed with descriptive statistics, Cronbach's alpha, Pearson correlation, multiple regression, a maturity index, and a capability priority matrix. Every capability was rated in the high band, led by worker safety outcome effectiveness at a mean of 4.28 and adaptive protection and fast tripping at 4.20; reliability was strong, with alpha from 0.83 to 0.94. All correlations were positive and significant, the strongest being r = 0.80 between predictive mitigation maturity and safety effectiveness. The regression model explained 74.6% of the variance in effectiveness, R² = 0.746, adjusted R² = 0.736, F(6,145) = 70.94, p < 0.001, with predictive mitigation maturity the leading predictor, β = 0.32, ahead of adaptive protection and fast tripping, β = 0.26, and predictive fault sensing and diagnostics, β = 0.22. The central finding is that arc-flash safety is decided less by any single device than by how tightly a plant couples sensing, prediction, interruption, and recovery into one fast loop — and that the plants protecting workers best are those that have matured that loop rather than assembled protective hardware piecemeal.
Zitieren
APA
Shohel, M. S. H. (2026). Impact of Predictive Arc-Flash Mitigation on Safety, Downtime, and Retrofit Efficiency in U.S. Manufacturing Power Systems. American Journal of Data Science and Analytics, 07(06), 182-199. https://doi.org/10.63125/855hx414
Vancouver
Shohel MSH. Impact of Predictive Arc-Flash Mitigation on Safety, Downtime, and Retrofit Efficiency in U.S. Manufacturing Power Systems. American Journal of Data Science and Analytics. 2026;07(06):182-199. doi:10.63125/855hx414
BibTeX
@article{Shohel2026,
author = {Shohel, Mohammad Shoriful Hossan},
title = {Impact of Predictive Arc-Flash Mitigation on Safety, Downtime, and Retrofit Efficiency in U.S. Manufacturing Power Systems},
journal = {American Journal of Data Science and Analytics},
year = {2026},
volume = {07},
number = {06},
pages = {182--199},
doi = {10.63125/855hx414}
}
EUVIMED