Demand for artificial intelligence (AI) and cloud services is increasing the need for data center capacity, but little peer-reviewed evidence shows how such facilities are financed in emerging markets. This study asks how operators combine development finance, commercial debt, equity, and internal funding; which disclosed mechanisms address tenor, currency, construction, energy, and demand risks; and how an illustrative cash flow model responds to financing, electricity, and currency shocks. A purposive comparative documentary case study examines five case groups (Yondr in Malaysia, ODATA in Brazil, Africa Data Centres, WIOCC and OADC, and PAIX) comprising seven financing events disclosed between 2020 and 2024, with World Bank indicators for seven countries from 2015 to 2025. Structures ranged from a project company with initial loan ceilings of up to US$600 million against an estimated US$874 million cost to corporate loans, a regional facility whose first draw was 27.7% of its ceiling, and a US$20 million equity tranche. A development finance institution lent in four case groups. Only one event disclosed a tenor, one proposed a local currency tranche, and none disclosed loan pricing, hedging, or customer contract terms. Only one case linked demand explicitly to AI. In a hypothetical model, a base debt service coverage ratio of 1.50 stayed above an illustrative 1.20 under each single electricity, interest rate, and depreciation shock, but fell to 1.19 with a 10% revenue reduction and 0.82 in a combined scenario. Disclosures are informative but incomplete, and the cases are not representative.
Zitieren
APA
Oke, P. T., & Oyekade, A. T. (2026). Financing the AI Infrastructure Boom: Capital Structuring, Investment Risks, and the Bankability of Data Center Projects in Emerging Markets. Econova, 3(1), 105-139. https://doi.org/10.63084/econova.v3i1.129
Vancouver
Oke PT, Oyekade AT. Financing the AI Infrastructure Boom: Capital Structuring, Investment Risks, and the Bankability of Data Center Projects in Emerging Markets. Econova. 2026;3(1):105-139. doi:10.63084/econova.v3i1.129
BibTeX
@article{Oke2026,
author = {Oke, Peter Tobi and Oyekade, Aliyah Toyin},
title = {Financing the AI Infrastructure Boom: Capital Structuring, Investment Risks, and the Bankability of Data Center Projects in Emerging Markets},
journal = {Econova},
year = {2026},
volume = {3},
number = {1},
pages = {105--139},
doi = {10.63084/econova.v3i1.129}
}
EUVIMED