Load Flow Analysis of 132 kV Transmission Line with Optimally Terminated Service Potential Transformer Substations

Joel Mwithui Kitheka, Peter Musau Moses, Abraham Mutunga Nyete, Nicodemus O. Abungu

Journal of Power, Energy, and Control · 2025

DOI: 10.62777/pec.v2i1.36 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Journal of Power, Energy, and Control, 2025. Verfasst von Joel Mwithui Kitheka und 3 weiteren Autor:innen. Die Arbeit nennt 22 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Most villages in Sub-Saharan Africa still lack electricity, despite numerous initiatives and commissions established to address power demands in developing countries. Renewable energy, rural electrification, and non-conventional substations are currently being employed to tackle the electricity issue. This research explored the penetration level of Service Potential Transformer (SPT) substations to solve the lack of electricity in villages near high-voltage transmission lines. The study analyzed the power flow in the 132 kV Juja-Rabai transmission line using PowerWorld Simulator software and determined the optimal termination points for SPT substations. Cost minimization was used as the objective function. At the same time, the voltage profile of the transmission line, the power demand of households, and the distance of villages from the transmission line served as the research constraints. The findings indicated that seven SPT substations could be installed along the 132 kV Juja-Rabai transmission line to supply electricity to nearby villages. These non-conventional substations would be integrated with the existing conventional substations on the transmission line. The power flow analysis for the line was also conducted.

Zitieren

APA

Kitheka, J. M., Moses, P. M., Nyete, A. M., & Abungu, N. O. (2025). Load Flow Analysis of 132 kV Transmission Line with Optimally Terminated Service Potential Transformer Substations. Journal of Power, Energy, and Control. https://doi.org/10.62777/pec.v2i1.36

Vancouver

Kitheka JM, Moses PM, Nyete AM, Abungu NO. Load Flow Analysis of 132 kV Transmission Line with Optimally Terminated Service Potential Transformer Substations. Journal of Power, Energy, and Control. 2025. doi:10.62777/pec.v2i1.36

BibTeX
@article{Kitheka2025,
  author = {Kitheka, Joel Mwithui and Moses, Peter Musau and Nyete, Abraham Mutunga and Abungu, Nicodemus O.},
  title = {Load Flow Analysis of 132 kV Transmission Line with Optimally Terminated Service Potential Transformer Substations},
  journal = {Journal of Power, Energy, and Control},
  year = {2025},
  doi = {10.62777/pec.v2i1.36}
}