EUVIMEDEUVIMED entdecken
Open Access · CC BY-NC-SA 4.0

Analisis Perhitungan Quantity Take Off Jembatan Rangka Baja Menggunakan Metode (BIM) dengan Autodesk Revit(Studi Kasus: Perencanaan Jembatan Ruas Selat Baru - Deluk)

Azmi Maulana, Dedi Enda

Jurnal Ragam Pengabdian · 29.07.2026 · 3 (2) · 4274-4286

DOI: 10.62710/s9h6qs77 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Jurnal Ragam Pengabdian, online erschienen am 29.07.2026. Verfasst von Azmi Maulana und 1 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-NC-SA 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The construction industry is increasingly adopting Building Information Modeling (BIM) to support Quantity Take Off (QTO), as conventional methods based on two-dimensional drawings, which are still widely used in Indonesia, are prone to measurement errors, inconsistent results, and time inefficiency. This study aimed to develop a three-dimensional BIM model of a steel truss bridge using a case study of the Selat Baru–Deluk Bridge with Autodesk Revit and compare the calculated concrete and reinforcement volumes with manual calculations. The model was developed by converting two-dimensional Detail Engineering Design (DED) drawings into a three-dimensional model. Volume calculations were automatically generated using the Schedule/Quantities feature in Autodesk Revit, while the conventional method used simple geometric formulas. The results showed that the average difference between the two methods was only 0.107% for concrete and 0.463% for reinforcement. The Root Mean Square Error (RMSE) values were 0.511% for concrete and 1.402% for reinforcement. These findings indicate that BIM-based quantity estimation using Autodesk Revit provides higher accuracy, efficiency, and precision compared to conventional methods in bridge QTO calculations.

Zitieren

APA

Maulana, A., & Enda, D. (2026). Analisis Perhitungan Quantity Take Off Jembatan Rangka Baja Menggunakan Metode (BIM) dengan Autodesk Revit(Studi Kasus: Perencanaan Jembatan Ruas Selat Baru - Deluk). Jurnal Ragam Pengabdian, 3(2), 4274-4286. https://doi.org/10.62710/s9h6qs77

Vancouver

Maulana A, Enda D. Analisis Perhitungan Quantity Take Off Jembatan Rangka Baja Menggunakan Metode (BIM) dengan Autodesk Revit(Studi Kasus: Perencanaan Jembatan Ruas Selat Baru - Deluk). Jurnal Ragam Pengabdian. 2026;3(2):4274-4286. doi:10.62710/s9h6qs77

BibTeX
@article{Maulana2026,
  author = {Maulana, Azmi and Enda, Dedi},
  title = {Analisis Perhitungan Quantity Take Off Jembatan Rangka Baja Menggunakan Metode (BIM) dengan Autodesk Revit(Studi Kasus: Perencanaan Jembatan Ruas Selat Baru - Deluk)},
  journal = {Jurnal Ragam Pengabdian},
  year = {2026},
  volume = {3},
  number = {2},
  pages = {4274--4286},
  doi = {10.62710/s9h6qs77}
}
Kostenlos starten →