Research on Resource Management and Cost Control in Hotel Renovation Projects Based on a Personnel-Equipment Aggregation System

Hao Xu, Shu Ni

Journal of Management and Social Development · 2026-02 · 3 (1) · 65-71

DOI: 10.62517/jmsd.202612109 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Journal of Management and Social Development, 2026-02. Verfasst von Hao Xu und 1 weiteren Autor:innen. Die Arbeit nennt 10 Literaturangaben.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

With the transformation and development of the construction industry, the efficient management of key resources (labour, materials, and machinery) in construction projects has become central to ensuring smooth project progression. Traditional resource management approaches often face challenges such as data lag, inaccurate information, and inefficient resource allocation, particularly in large-scale, complex projects. To address these issues, information-based management has increasingly been applied to construction projects. Among these, the labour-material-machinery aggregation management system, as an advanced resource management method, has gained widespread adoption in projects.This study examines the application effectiveness of the labour-equipment-materials aggregation management system through the case of the North Garden Renovation and Upgrade Project for Hefei's DXL Hotel. By statistically analysing the utilisation of labour, machinery, and materials, it details resource usage data and cost distribution. Findings indicate that implementing this system enables project teams to monitor resource deployment in real time, optimise resource scheduling, reduce waste, and achieve dual improvements in cost control and schedule management.Specifically, real-time data collection and analysis of labour, machinery, and materials substantially enhanced the precision and timeliness of resource management. The system enabled the project team to adjust staffing levels more effectively, optimise equipment utilisation, and procure materials rationally, thereby significantly reducing resource wastage and improving overall project management efficiency and economic viability. The study also analysed cost fluctuations, illustrating the cost distribution of different resources within the project, providing a basis for optimising resource management and cost control in subsequent projects.

Zitieren

APA

Xu, H., & Ni, S. (2026). Research on Resource Management and Cost Control in Hotel Renovation Projects Based on a Personnel-Equipment Aggregation System. Journal of Management and Social Development, 3(1), 65-71. https://doi.org/10.62517/jmsd.202612109

Vancouver

Xu H, Ni S. Research on Resource Management and Cost Control in Hotel Renovation Projects Based on a Personnel-Equipment Aggregation System. Journal of Management and Social Development. 2026;3(1):65-71. doi:10.62517/jmsd.202612109

BibTeX
@article{Xu2026,
  author = {Xu, Hao and Ni, Shu},
  title = {Research on Resource Management and Cost Control in Hotel Renovation Projects Based on a Personnel-Equipment Aggregation System},
  journal = {Journal of Management and Social Development},
  year = {2026},
  volume = {3},
  number = {1},
  pages = {65--71},
  doi = {10.62517/jmsd.202612109}
}
Kostenlos starten →