Economic efficiency analysis of an investment strategy based on oversizing the installed capacity of photovoltaic and wind farms beyond their grid connection capacity

Paweł Włoch

Energy Policy Studies · 2025

DOI: 10.62316/djcx5179 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Energy Policy Studies, 2025. Verfasst von Paweł Włoch.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

In the context of the ongoing energy transition, one of the major challenges is the increasing difficulty of securing new grid connection capacities for renewable energy projects. The aim of this study was to analyse the potential for oversizing the installed capacity of wind and photovoltaic power plants beyond their agreed grid connection capacity. The evaluation was performed using an indicator-based analytical framework combined with an assessment of improvements in the efficiency of the existing grid connection. The results clearly demonstrate that oversizing generation units beyond the contracted grid capacity constitutes a rational investment strategy, improving the utilisation of the connection point and exerting a positive impact on the overall economic performance of the project. Key words: Wind energy, photovoltaics, system oversizing, grid connection utilisation

Zitieren

APA

Włoch, P. (2025). Economic efficiency analysis of an investment strategy based on oversizing the installed capacity of photovoltaic and wind farms beyond their grid connection capacity. Energy Policy Studies. https://doi.org/10.62316/djcx5179

Vancouver

Włoch P. Economic efficiency analysis of an investment strategy based on oversizing the installed capacity of photovoltaic and wind farms beyond their grid connection capacity. Energy Policy Studies. 2025. doi:10.62316/djcx5179

BibTeX
@article{Woch2025,
  author = {Włoch, Paweł},
  title = {Economic efficiency analysis of an investment strategy based on oversizing the installed capacity of photovoltaic and wind farms beyond their grid connection capacity},
  journal = {Energy Policy Studies},
  year = {2025},
  doi = {10.62316/djcx5179}
}