The Paradigm of Installation-Oriented Planning
Collaborate Engineering Daily Book Series · 27.06.2026 · 4 (1) · 57-62
DOI: 10.62012/collaborate.vi.111 ↗Kurz gefasst
Fachartikel in der Zeitschrift Collaborate Engineering Daily Book Series, online erschienen am 27.06.2026. Verfasst von Alexander Poda Siahaan und 5 weiteren Autor:innen.
Abstract (Originalsprache)
The selection of a pipeline route is a critical stage in submarine installation projects that dictates technical success and longterm cost efficiency. This article evaluates the corridor planning for a clean water transmission system from the Leupung mountain springs to the Banda Aceh distribution center, specifically comparing conventional land alignments with submarine alternatives. The study employs a comparative evaluation based on techno-economic criteria, including seabed geology, bathymetry, and natural disaster mitigation specifically addressing the landslide risks prevalent in the Aceh Besar region. The analysis emphasizes that route selection is an "installation-oriented planning" process rather than a mere geometric exercise. By integrating hydrodynamic stability factors and shore approach methods, the research argues that a submarine route utilizing High-Density Polyethylene (HDPE) provides superior resilience against the seismic and geological characteristics of Aceh.
Zitieren
APA
Siahaan, A. P., Ramadhan, A., Septian, A. A., Obryan, J., Alfath, M. F., & Nwaogbe, O. R. (2026). The Paradigm of Installation-Oriented Planning. Collaborate Engineering Daily Book Series, 4(1), 57-62. https://doi.org/10.62012/collaborate.vi.111
Vancouver
Siahaan AP, Ramadhan A, Septian AA, Obryan J, Alfath MF, Nwaogbe OR. The Paradigm of Installation-Oriented Planning. Collaborate Engineering Daily Book Series. 2026;4(1):57-62. doi:10.62012/collaborate.vi.111
BibTeX
@article{Siahaan2026,
author = {Siahaan, Alexander Poda and Ramadhan, Abdullah and Septian, Ahmad Asro and Obryan, Jonathan and Alfath, Muh. Fachrul and Nwaogbe, Obioma Reuben},
title = {The Paradigm of Installation-Oriented Planning},
journal = {Collaborate Engineering Daily Book Series},
year = {2026},
volume = {4},
number = {1},
pages = {57--62},
doi = {10.62012/collaborate.vi.111}
}
EUVIMED