EUVIMEDEUVIMED entdecken
Crossref

Why Subsea Pipeline Installation Is Not Merely a Construction Issue

Agnes Abigail Virgynia Rugian, Elfa Fahrizha Alam, Iara Anggi Quisita Sitorus, Azizah Dwicahyani, Muh. Suryadi, Mohammad Riadh

Collaborate Engineering Daily Book Series · 27.06.2026 · 4 (1) · 14-19

DOI: 10.62012/collaborate.vi.101 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Collaborate Engineering Daily Book Series, online erschienen am 27.06.2026. Verfasst von Agnes Abigail Virgynia Rugian und 5 weiteren Autor:innen.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Subsea pipeline installation is a critical component of offshore energy infrastructure that has traditionally been understood as a technical construction activity on the seabed. However, developments in the literature indicate that the success of this system is not solely determined by the installation phase, but is highly dependent on early planning processes, particularly pipeline route selection and seabed condition assessment. This article aims to conceptually examine that subsea pipeline installation is a multidimensional process involving technical, spatial, and risk-based aspects. The study is conducted using a literature review approach, referring to studies on Pemping Island as well as subsea pipeline engineering literature. The results show that seabed conditions such as slope, sediment type, and geohazard zones have a significant influence on pipeline route stability. Therefore, subsea pipeline installation should be understood as part of a risk-based decision-making system, rather than merely a construction activity.

Zitieren

APA

Rugian, A. A. V., Alam, E. F., Sitorus, I. A. Q., Dwicahyani, A., Suryadi, M., & Riadh, M. (2026). Why Subsea Pipeline Installation Is Not Merely a Construction Issue. Collaborate Engineering Daily Book Series, 4(1), 14-19. https://doi.org/10.62012/collaborate.vi.101

Vancouver

Rugian AAV, Alam EF, Sitorus IAQ, Dwicahyani A, Suryadi M, Riadh M. Why Subsea Pipeline Installation Is Not Merely a Construction Issue. Collaborate Engineering Daily Book Series. 2026;4(1):14-19. doi:10.62012/collaborate.vi.101

BibTeX
@article{Rugian2026,
  author = {Rugian, Agnes Abigail Virgynia and Alam, Elfa Fahrizha and Sitorus, Iara Anggi Quisita and Dwicahyani, Azizah and Suryadi, Muh. and Riadh, Mohammad},
  title = {Why Subsea Pipeline Installation Is Not Merely a Construction Issue},
  journal = {Collaborate Engineering Daily Book Series},
  year = {2026},
  volume = {4},
  number = {1},
  pages = {14--19},
  doi = {10.62012/collaborate.vi.101}
}
Kostenlos starten →