EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Cost Estimation for Blasting and Painting Repair Work on KMP. Kormomolin

Nurul Hijrah Bahar Bahar, Taufiqur Rachman

Zona Laut Jurnal Inovasi Sains Dan Teknologi Kelautan · 21.07.2026 · 184-189

DOI: 10.62012/7jj2ha63 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Zona Laut Jurnal Inovasi Sains Dan Teknologi Kelautan, online erschienen am 21.07.2026. Verfasst von Nurul Hijrah Bahar Bahar und 1 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

One of the stages in the ship hull maintenance and repair process is the blasting and painting process. Parts of the ship hull that do not fulfill classification standards will be repaired to extend the ship's operational life. This study aims to estimate the material requirements and costs of blasting and painting in the ship hull repair process, so that the calculation of material requirements and repair costs can be used as a reference for ship owners in future repair activities. The methods used include data collection and repair of the KMP Kormomolin ship, as well as calculations of material usage efficiency based on the area worked on. Estimates of the requirements for each material are calculated based on the surface area of the ship and the efficiency of use per liter, then converted to cans or kilograms. The analysis results show that the main material requirements consist of copper slag as a blasting medium, as well as various types of coat such as primer, anti-corrosion (AC), anti-fouling (AF), and finishing coat. The total cost is calculated from the number of requirements multiplied by the unit price of the material. From the calculation results, it is known that the highest costs come from anti-fouling coat.

Zitieren

APA

Bahar, N. H. B., & Rachman, T. (2026). Cost Estimation for Blasting and Painting Repair Work on KMP. Kormomolin. Zona Laut Jurnal Inovasi Sains Dan Teknologi Kelautan, 184-189. https://doi.org/10.62012/7jj2ha63

Vancouver

Bahar NHB, Rachman T. Cost Estimation for Blasting and Painting Repair Work on KMP. Kormomolin. Zona Laut Jurnal Inovasi Sains Dan Teknologi Kelautan. 2026:184-189. doi:10.62012/7jj2ha63

BibTeX
@article{Bahar2026,
  author = {Bahar, Nurul Hijrah Bahar and Rachman, Taufiqur},
  title = {Cost Estimation for Blasting and Painting Repair Work on KMP. Kormomolin},
  journal = {Zona Laut Jurnal Inovasi Sains Dan Teknologi Kelautan},
  year = {2026},
  pages = {184--189},
  doi = {10.62012/7jj2ha63}
}
Kostenlos starten →