Improving Schedule Performance in Data Center Construction Using Critical Path Analysis: An Applied Project Scheduling Perspective at Clune Construction

Chinweuju Maureen Obi

Stout in Business and Management · 2026

DOI: 10.61424/rc94b651 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Stout in Business and Management, 2026. Verfasst von Chinweuju Maureen Obi.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Data center construction projects are characterized by complex activity interrelationships, high coordination requirements, long lead equipment, specialized mechanical and electrical systems, and demanding completion timeframes. These characteristics place significant responsibility on project schedulers to identify schedule driving activities, track schedule changes, evaluate delay impacts, and support project responses within a narrow schedule control window. This paper explores how Critical Path Analysis (CPA) can be used to improve schedule performance within the context of Clune Construction’s project scheduling practice. Clune Construction’s mission critical practice specializes in data center projects, where early planning, particularly procurement planning, deliberate activity sequencing, phased turnover, commissioning, and a structured schedule control approach all contribute to project delivery. A narrative literature review with thematic synthesis was conducted based on 26 selected sources covering critical path analysis, construction scheduling, schedule risk, resource allocation and optimization, data center construction, and technology enabled project management. Critical Path Analysis was found to provide a systematic means of identifying activities that influence project completion, establishing relationships between project activities, identifying schedule float, and tracking schedule changes that affect the critical path. It was also found that activity duration shifts, procurement and supply chain limitations, resource availability, coordination needs, project and activity complexity, and execution risk are associated with schedule performance. For a project scheduler, the practical benefit of CPA therefore extends beyond establishing a baseline schedule to include continuous schedule monitoring, critical path reassessment, risk identification, resource prioritization, and corrective action planning. Based on the reviewed literature and the practical requirements of data center construction, the article proposes a framework linking project planning, activity sequencing, critical path analysis, continuous monitoring and risk analysis, resource prioritization, corrective action, and improved schedule performance. The article concludes that CPA can serve as a practical schedule control mechanism for data center construction when continuously updated and integrated with procurement, coordination, resource management, and complementary project management practices.

Zitieren

APA

Obi, C. M. (2026). Improving Schedule Performance in Data Center Construction Using Critical Path Analysis: An Applied Project Scheduling Perspective at Clune Construction. Stout in Business and Management. https://doi.org/10.61424/rc94b651

Vancouver

Obi CM. Improving Schedule Performance in Data Center Construction Using Critical Path Analysis: An Applied Project Scheduling Perspective at Clune Construction. Stout in Business and Management. 2026. doi:10.61424/rc94b651

BibTeX
@article{Obi2026,
  author = {Obi, Chinweuju Maureen},
  title = {Improving Schedule Performance in Data Center Construction Using Critical Path Analysis: An Applied Project Scheduling Perspective at Clune Construction},
  journal = {Stout in Business and Management},
  year = {2026},
  doi = {10.61424/rc94b651}
}
Kostenlos starten →