Analisis Perbandingan Biaya dan Waktu Metode Konstruksi Modular dan Konvensional Menggunakan Microsoft Project

Fredy Ekamaz, Isnaini Lilis Elviyanti, Titi Maemunah, Dwiyono Waluyo, Ahmad Aftah Syukron, Eko Priyanto, Imam Satibi

Venus: Jurnal Publikasi Rumpun Ilmu Teknik · 30.06.2026 · 4 (3) · 88-103

DOI: 10.61132/venus.v4i3.1576 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Venus: Jurnal Publikasi Rumpun Ilmu Teknik, online erschienen am 30.06.2026. Verfasst von Fredy Ekamaz und 6 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-SA 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The development of the construction industry requires building methods that are faster, more cost-efficient, and capable of delivering higher quality. Conventional construction methods are still widely used in building projects; however, they often face challenges such as longer construction durations, high labor requirements, and the risk of material waste. One alternative approach is modular construction, which can accelerate project execution, improve construction quality, and reduce both material waste and project costs. This study compares conventional and modular construction methods in the development of the building at Universitas Ma'arif Nahdlatul Ulama (UMNU) Kebumen using Microsoft Project for cost and schedule analysis. The results indicate that the estimated construction cost using the conventional method is IDR 1.322.412.000, while the modular method requires IDR 830.000.000. This represents a cost saving of IDR 492.412.000, equivalent to 37,24%, when using the modular method. In terms of project duration, the conventional method is estimated to require 120 calendar days, whereas the modular method requires only 40 calendar days. Consequently, the modular method reduces the construction duration by 80 days, achieving a time efficiency of 66,67%. The findings demonstrate that the modular construction method is more efficient than the conventional method for the construction of the UMNU Kebumen building in terms of both project cost and construction duration.

Zitieren

APA

Ekamaz, F., Elviyanti, I. L., Maemunah, T., Waluyo, D., Syukron, A. A., Priyanto, E., & Satibi, I. (2026). Analisis Perbandingan Biaya dan Waktu Metode Konstruksi Modular dan Konvensional Menggunakan Microsoft Project. Venus: Jurnal Publikasi Rumpun Ilmu Teknik, 4(3), 88-103. https://doi.org/10.61132/venus.v4i3.1576

Vancouver

Ekamaz F, Elviyanti IL, Maemunah T, Waluyo D, Syukron AA, Priyanto E, et al. Analisis Perbandingan Biaya dan Waktu Metode Konstruksi Modular dan Konvensional Menggunakan Microsoft Project. Venus: Jurnal Publikasi Rumpun Ilmu Teknik. 2026;4(3):88-103. doi:10.61132/venus.v4i3.1576

BibTeX
@article{Ekamaz2026,
  author = {Ekamaz, Fredy and Elviyanti, Isnaini Lilis and Maemunah, Titi and Waluyo, Dwiyono and Syukron, Ahmad Aftah and Priyanto, Eko and Satibi, Imam},
  title = {Analisis Perbandingan Biaya dan Waktu Metode Konstruksi Modular dan Konvensional Menggunakan Microsoft Project},
  journal = {Venus: Jurnal Publikasi Rumpun Ilmu Teknik},
  year = {2026},
  volume = {4},
  number = {3},
  pages = {88--103},
  doi = {10.61132/venus.v4i3.1576}
}
Kostenlos starten →