Penerapan Metode Collaborative Planning Forecasting & Replenishment (CPFR) dalam Perencanaan Persediaan untuk Meningkatkan Kepatuhan Lead Time Supply terhadap KPI pada Studi Kasus PT XYZ
Jupiter: Publikasi Ilmu Keteknikan Industri, Teknik Elektro dan Informatika · 17.03.2026 · 4 (2) · 40-53
DOI: 10.61132/jupiter.v4i2.1345 ↗Kurz gefasst
Fachartikel in der Zeitschrift Jupiter: Publikasi Ilmu Keteknikan Industri, Teknik Elektro dan Informatika, online erschienen am 17.03.2026. Verfasst von Qisma Rosalina Wahda und 2 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-SA 4.0).
Abstract (Originalsprache)
Ineffective spare part inventory planning may lead to supply delays and reduced compliance with lead time supply key performance indicators (KPIs). This study aims to implement the Collaborative Planning, Forecasting, and Replenishment (CPFR) method in spare part inventory planning at PT XYZ and to compare lead time supply performance before and after the implementation of the CPFR method. This research utilizes spare part usage data from January to June 2025, focusing on fast-moving spare parts. Demand forecasting is conducted using an error forecasting approach with the moving average method. Forecast accuracy is evaluated using the Mean Absolute Deviation (MAD) and Mean Absolute Percentage Error (MAPE). Furthermore, inventory planning is carried out through the calculation of safety stock and reorder point (ROP) as the basis for determining replenishment decisions. The results indicate that the simulated implementation of the CPFR method provides a more structured and anticipative inventory planning process. The comparison of performance before and after the application of CPFR shows an improvement in lead time supply compliance with the established KPIs. Therefore, the CPFR method has the potential to support improved spare part inventory planning performance at PT XYZ.
Zitieren
APA
Wahda, Q. R., Indriastiningsih, E., & Nugrahadi, B. (2026). Penerapan Metode Collaborative Planning Forecasting & Replenishment (CPFR) dalam Perencanaan Persediaan untuk Meningkatkan Kepatuhan Lead Time Supply terhadap KPI pada Studi Kasus PT XYZ. Jupiter: Publikasi Ilmu Keteknikan Industri, Teknik Elektro dan Informatika, 4(2), 40-53. https://doi.org/10.61132/jupiter.v4i2.1345
Vancouver
Wahda QR, Indriastiningsih E, Nugrahadi B. Penerapan Metode Collaborative Planning Forecasting & Replenishment (CPFR) dalam Perencanaan Persediaan untuk Meningkatkan Kepatuhan Lead Time Supply terhadap KPI pada Studi Kasus PT XYZ. Jupiter: Publikasi Ilmu Keteknikan Industri, Teknik Elektro dan Informatika. 2026;4(2):40-53. doi:10.61132/jupiter.v4i2.1345
BibTeX
@article{Wahda2026,
author = {Wahda, Qisma Rosalina and Indriastiningsih, Erna and Nugrahadi, Bekti},
title = {Penerapan Metode Collaborative Planning Forecasting & Replenishment (CPFR) dalam Perencanaan Persediaan untuk Meningkatkan Kepatuhan Lead Time Supply terhadap KPI pada Studi Kasus PT XYZ},
journal = {Jupiter: Publikasi Ilmu Keteknikan Industri, Teknik Elektro dan Informatika},
year = {2026},
volume = {4},
number = {2},
pages = {40--53},
doi = {10.61132/jupiter.v4i2.1345}
}
EUVIMED