Crossref
Construction Project Schedule Recovery Using Standardized Prompting for Generative AI
The Journal of Innovation Industry Technology · 30.06.2026 · 4 (2) · 59-66
DOI: 10.60032/jiit.2026.4.2.59 ↗Kurz gefasst
Fachartikel in der Zeitschrift The Journal of Innovation Industry Technology, erschienen am 30.06.2026. Verfasst von Jun-Ah Song und 1 weiteren Autor:innen.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Zitieren
APA
Song, J., & Yun, S. (2026). Construction Project Schedule Recovery Using Standardized Prompting for Generative AI. The Journal of Innovation Industry Technology, 4(2), 59-66. https://doi.org/10.60032/jiit.2026.4.2.59
Vancouver
Song J, Yun S. Construction Project Schedule Recovery Using Standardized Prompting for Generative AI. The Journal of Innovation Industry Technology. 2026;4(2):59-66. doi:10.60032/jiit.2026.4.2.59
BibTeX
@article{Song2026,
author = {Song, Jun-Ah and Yun, Seok-Heon},
title = {Construction Project Schedule Recovery Using Standardized Prompting for Generative AI},
journal = {The Journal of Innovation Industry Technology},
year = {2026},
volume = {4},
number = {2},
pages = {59--66},
doi = {10.60032/jiit.2026.4.2.59}
}
EUVIMED