Talaud Steam Power Plant Jetty Structure Design Using Soldier Pile Reinforcement to Increase Ship Berthing Capacity from 5,000 Dwt to 10,000 Dwt

Suteni Suteni, Christiono Christiono, Victor Assani Desiawan, Maulana Putra

Journal of Technology and Engineering · 27.10.2026 · 4 (2) · 1-27

DOI: 10.59613/journaloftechnologyandengineering.v4i2.553 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Journal of Technology and Engineering, online erschienen am 27.10.2026. Verfasst von Suteni Suteni und 3 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The Talaud PLTU jetty is an important infrastructure that functions as a berthing facility for coal transport ships to ensure the continuity of the power plant's fuel supply. The increase in operational needs requires the ship's berthing capacity to be increased from 5,000 Dead Weight Tonnage (DWT) to 10,000 DWT based on a request from PLN due to the unavailability of 5,000 DWT ships at the local location, which was then assessed with document no. assessment/01/A4. This causes an increase in berthing forces, mooring forces, and lateral loads acting on the jetty structure. This condition requires an evaluation of the capacity of the existing structure and the determination of effective reinforcement methods without disrupting the operation of the power plant. This engineering practice aims to evaluate the performance of the existing jetty structure and design reinforcement alternatives that can increase the capacity of the structure according to operational needs. The methods used include document studies, problem identification, technical data collection, evaluation of the existing structure, load analysis using structural analysis software, and a study of several alternative reinforcement methods based on technical aspects, constructability, cost efficiency, and ease of maintenance. The evaluation results show that the use of soldier piles is the most suitable alternative for increasing the berthing capacity of ships up to 10,000 DWT. This system is able to increase the structure's capacity against horizontal loads, distribute forces more evenly, and minimize the demolition of existing structures. In addition to providing cost and implementation time efficiencies, this method is also able to maintain the continuity of the PLTU operation during the construction process. The application of the soldier pile method shows that the modification of the jetty structure can be carried out safely, reliably, economically, and sustainably in accordance with the principles of professional engineering practices.

Zitieren

APA

Suteni, S., Christiono, C., Desiawan, V. A., & Putra, M. (2026). Talaud Steam Power Plant Jetty Structure Design Using Soldier Pile Reinforcement to Increase Ship Berthing Capacity from 5,000 Dwt to 10,000 Dwt. Journal of Technology and Engineering, 4(2), 1-27. https://doi.org/10.59613/journaloftechnologyandengineering.v4i2.553

Vancouver

Suteni S, Christiono C, Desiawan VA, Putra M. Talaud Steam Power Plant Jetty Structure Design Using Soldier Pile Reinforcement to Increase Ship Berthing Capacity from 5,000 Dwt to 10,000 Dwt. Journal of Technology and Engineering. 2026;4(2):1-27. doi:10.59613/journaloftechnologyandengineering.v4i2.553

BibTeX
@article{Suteni2026,
  author = {Suteni, Suteni and Christiono, Christiono and Desiawan, Victor Assani and Putra, Maulana},
  title = {Talaud Steam Power Plant Jetty Structure Design Using Soldier Pile Reinforcement to Increase Ship Berthing Capacity from 5,000 Dwt to 10,000 Dwt},
  journal = {Journal of Technology and Engineering},
  year = {2026},
  volume = {4},
  number = {2},
  pages = {1--27},
  doi = {10.59613/journaloftechnologyandengineering.v4i2.553}
}
Kostenlos starten →