System Availability Optimization: Integrating Quantity Discounts and Delivery Lead Time Considerations

Zahra Sobhani, Mahmoud Shahrokhi, Robert Keyser

Journal of Decision Science and Applications · 07.11.2026 · 1 · 236-255

DOI: 10.59543/wrg7xp12 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Journal of Decision Science and Applications, online erschienen am 07.11.2026. Verfasst von Zahra Sobhani und 2 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Designing an industrial system involves a trade-off between the quality of its components, their purchasing cost, and the time needed to deliver and assemble them. Higher-quality components increase system availability but cost more, and large orders reduce unit prices through quantity-based discounts but extend delivery lead times, which may delay system construction and incur penalties. This paper proposes a model that allocates the orders of the components of a series-parallel multi-state system to alternative suppliers, considering price, reliability, repair rate, quantity-based discount, and delivery lead time simultaneously. The system is described by a continuous-time Markov chain with full-capacity, half-capacity, and shutdown states, whose steady-state probabilities are embedded in a nonlinear binary mathematical program. The program minimizes the total cost of the construction phase, including component purchase and project delay penalties, and of the exploitation phase, including the cost of operating at half capacity and of shutdown, subject to a budget limit, precedence relations among assembly activities, and a minimum system reliability. A numerical example based on the feedwater system of heat recovery steam generator boilers in combined-cycle power plants illustrates the model. The optimal plan achieves a system reliability of about 0.85, and the delay penalty accounts for more than half of the total cost. Sensitivity analyses show that removing quantity-based discounts lowers the quality of the selected components and increases operating costs, that a fixed delivery lead time leads to the selection of high-reliability components, and that the daily delay penalty is the most influential parameter. The proposed approach helps decision makers balance construction objectives and long-term operational availability.

Zitieren

APA

Sobhani, Z., Shahrokhi, M., & Keyser, R. (2026). System Availability Optimization: Integrating Quantity Discounts and Delivery Lead Time Considerations. Journal of Decision Science and Applications, 1, 236-255. https://doi.org/10.59543/wrg7xp12

Vancouver

Sobhani Z, Shahrokhi M, Keyser R. System Availability Optimization: Integrating Quantity Discounts and Delivery Lead Time Considerations. Journal of Decision Science and Applications. 2026;1:236-255. doi:10.59543/wrg7xp12

BibTeX
@article{Sobhani2026,
  author = {Sobhani, Zahra and Shahrokhi, Mahmoud and Keyser, Robert},
  title = {System Availability Optimization: Integrating Quantity Discounts and Delivery Lead Time Considerations},
  journal = {Journal of Decision Science and Applications},
  year = {2026},
  volume = {1},
  pages = {236--255},
  doi = {10.59543/wrg7xp12}
}