A comparative analysis of side and stern installation of a monopile lifting operation using a heavy lift crane vessel
International Marine Design Conference · 19.05.2024
DOI: 10.59490/imdc.2024.822 ↗Kurz gefasst
Fachartikel in der Zeitschrift International Marine Design Conference, online erschienen am 19.05.2024. Verfasst von A.M. Elzinga und 2 weiteren Autor:innen. Die Arbeit wurde bisher 2-mal zitiert (Crossref). Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).
Abstract (Originalsprache)
This paper compares two 2XL monopile installation methods: at the leeward side of the heavy lift crane vessel and in the recess at the stern of the vessel. The multi-body system of the vessel, monopile, crane, and mission equipment induces interaction and resonance behaviour. Operational limits are assessed at the crane tip and pile gripper during upending and lowering of the monopile. Stern installation provides a larger operability window during upending compared to side installation. During the lowering stage, the operability depends on the monopile submergence: side and stern installation provide a comparable operability. Considering both stages, stern installation shows promising results.
Zitieren
APA
Elzinga, A., Stroo, J., & Kana, A. (2024). A comparative analysis of side and stern installation of a monopile lifting operation using a heavy lift crane vessel. International Marine Design Conference. https://doi.org/10.59490/imdc.2024.822
Vancouver
Elzinga A, Stroo J, Kana A. A comparative analysis of side and stern installation of a monopile lifting operation using a heavy lift crane vessel. International Marine Design Conference. 2024. doi:10.59490/imdc.2024.822
BibTeX
@article{Elzinga2024,
author = {Elzinga, A.M. and Stroo, J.D. and Kana, A.A.},
title = {A comparative analysis of side and stern installation of a monopile lifting operation using a heavy lift crane vessel},
journal = {International Marine Design Conference},
year = {2024},
doi = {10.59490/imdc.2024.822}
}
EUVIMED